Do I Need Planning Permission for a Two-Storey Side Extension in Coventry?
A two-storey extension to the side of your home, significantly increasing floor space on both levels. Subject to strict PD conditions to prevent a 'terracing' effect in residential streets.
Planning in Coventry
86%
of planning applications granted
99%
decided within the statutory or agreed time
91%
of householder applications decided within 8 weeks
In the year to December 2025, Coventry decided 1,226 planning applications. 687 of these were householder projects such as extensions, loft conversions and outbuildings, of which 91% were granted.
Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.
Important: Additional Restrictions May Apply in Coventry
Coventry has 18 conservation areas. These include Allesley Village Conservation Area, Brownshill Green Conservation Area, Chapelfields Conservation Area, Coventry Canal Conservation Area, Earlsdon Conservation Area, Far Gosford Street Conservation Area. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.
Coventry has 13 recorded Article 4 directions. These include Brownshill Green; Copsewood Grange and Lodge, New Century Park, Allard Way; Earlsdon; Lady Herberts Garden and the Burges. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Coventry planning department to check whether an Article 4 direction applies to your property.
Check with Coventry planning department before starting work to confirm whether your property is affected by any special designations.
Permitted Development Rules for a Two-Storey Side Extension
Generally permitted under Part 1, Class A, but with strict conditions designed to prevent properties appearing to merge with neighbours. Must maintain a minimum 1m gap from the side boundary at first-floor level and above.
Conditions
- 1Must not exceed half the width of the original house
- 2Must maintain at least 1m from the side boundary at first-floor level
- 3Roof pitch must match the existing house as far as practicable
- 4Materials must be similar in appearance to the existing dwelling
- 5Side-facing upper-floor windows must be obscure glazed and non-opening below 1.7m from the floor
Size and Dimension Limits
- Width: must not exceed half the width of the original dwelling
- Height: must not exceed the height of the existing roof ridge
- Must maintain 1m gap from side boundary at first floor and above
When Permitted Development Does Not Apply
- Must not cover more than half the curtilage
- Does not apply in front of the principal elevation
- Not permitted development in conservation areas, AONB, National Parks, the Broads, or World Heritage Sites
- Does not apply to flats or maisonettes
What About Building Regulations?
Building regulations approval is likely required
Full Building Regulations approval needed covering structural integrity, foundations, thermal performance, fire safety and escape routes, sound insulation between floors, ventilation, drainage, and electrical work.
Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Coventry building control or use an approved inspector.
How to Apply in Coventry
If you need planning permission for your two-storey side extension, you can apply through Coventry's planning department or via the national Planning Portal.
If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Coventry. This provides proof that your project does not need planning permission, which can be helpful when selling your property.
What Happens If I Build Without Permission?
Enforcement can require demolition of the upper floor or the entire extension. Two-storey side extensions that create a terracing effect are particularly likely to attract enforcement. Solicitors routinely flag these during property sales.
Frequently Asked Questions
Do I need planning permission for a two-storey side extension in Coventry?
Does a two-storey side extension in Coventry need building regulations?
How do I apply for planning permission in Coventry?
How long does planning permission take in Coventry?
What percentage of planning applications does Coventry approve?