Do I Need Planning Permission for a Swimming Pool in Worthing?

An outdoor or indoor swimming pool within the grounds of your home. Outdoor pools are generally treated as engineering operations and follow outbuilding area limits. Indoor pools within a new building follow outbuilding rules.

Planning in Worthing

91%

of planning applications granted

87%

decided within the statutory or agreed time

53%

of householder applications decided within 8 weeks

In the four quarters to 2026 Q1, Worthing decided 573 planning applications. 302 of these were householder projects such as extensions, loft conversions and outbuildings, of which 94% were granted.

Planning statistics: MHCLG planning application statistics, the four quarters to 2026 Q1. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Worthing

Worthing has 26 conservation areas. These include Broadwater, Broadwater Green, Chapel Road, Durrington, Farncombe Road, Goring. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Worthing has 8 recorded Article 4 directions. These include Ambrose Place; Church Road, Tarring; Cowper Road; Land West of The Plantation. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Worthing planning department to check whether an Article 4 direction applies to your property.

Check with Worthing planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Swimming Pool

Generally permitted. Outdoor swimming pools are considered engineering operations within the curtilage and are permitted provided the pool area (together with all other outbuildings) does not cover more than half the curtilage. An enclosed pool building follows outbuilding rules under Part 1, Class E.

Conditions

  • 1Must be within the curtilage of the dwelling
  • 2Must not cover more than half the curtilage (combined with other outbuildings and extensions)
  • 3If in an enclosed building, standard outbuilding height limits apply
  • 4Must be for purposes incidental to the enjoyment of the dwelling

Size and Dimension Limits

  • No specific pool size limit, but cumulative area must not exceed 50% of curtilage
  • Enclosing structure: same height limits as outbuildings

When Permitted Development Does Not Apply

  • Must not be forward of the principal elevation
  • In designated areas, additional restrictions apply
  • Indoor pool buildings are outbuildings and must comply with Part 1, Class E
  • Consider the impact on drainage and neighbouring properties

What About Building Regulations?

Building regulations approval is not usually required

An outdoor pool does not normally require Building Regulations approval. An indoor pool in an enclosed building may require approval depending on the building's size and whether it has electrical installations, structural elements, or drainage connections. Electrical installations near a pool must comply with Part P and BS 7671 (special requirements for swimming pools).

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Worthing building control or use an approved inspector.

How to Apply in Worthing

If you need planning permission for your swimming pool, you can apply through Worthing's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Worthing Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Worthing. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk for outdoor pools within PD limits. Pools that significantly alter ground levels or drainage may attract investigation. Enclosed pool buildings that exceed outbuilding limits need planning permission.

Frequently Asked Questions

Do I need planning permission for a swimming pool in Worthing?
Generally permitted. Outdoor swimming pools are considered engineering operations within the curtilage and are permitted provided the pool area (together with all other outbuildings) does not cover more than half the curtilage. An enclosed pool building follows outbuilding rules under Part 1, Class E. Note: Worthing has 26 conservation areas (including Broadwater, Broadwater Green, Chapel Road) and 8 recorded Article 4 directions where permitted development rights may be restricted. Check with Worthing planning department.
Does a swimming pool in Worthing need building regulations?
Building regulations approval is not usually required for a swimming pool. An outdoor pool does not normally require Building Regulations approval. An indoor pool in an enclosed building may require approval depending on the building's size and whether it has electrical installations, structural elements, or drainage connections. Electrical installations near a pool must comply with Part P and BS 7671 (special requirements for swimming pools).
How do I apply for planning permission in Worthing?
You can apply for planning permission through Worthing's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Worthing?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the four quarters to 2026 Q1, Worthing decided 87% of applications within the statutory or agreed time, and 53% of householder applications within 8 weeks.
What percentage of planning applications does Worthing approve?
Worthing granted 91% of the 573 planning applications it decided in the four quarters to 2026 Q1. For householder applications such as extensions and outbuildings, the approval rate was 94%.

Find a Builder in Worthing

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Swimming Pool rules in nearby council areas

Other projects in Worthing

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co