Do I Need Planning Permission for a Swimming Pool in Fareham?

An outdoor or indoor swimming pool within the grounds of your home. Outdoor pools are generally treated as engineering operations and follow outbuilding area limits. Indoor pools within a new building follow outbuilding rules.

Planning in Fareham

98%

of planning applications granted

99%

decided within the statutory or agreed time

89%

of householder applications decided within 8 weeks

In the year to December 2025, Fareham decided 595 planning applications. 395 of these were householder projects such as extensions, loft conversions and outbuildings, of which 99% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Fareham

Fareham has 13 conservation areas. These include Cams Hall, Catisfield, Fareham High Street, Hook, Osborn Road, Portchester Castle Street. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Fareham has Article 4 directions in force. These include Down End Farm; Hook; Hovercraft; Land Alongside River Meon, Titchfield. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Fareham planning department to check whether an Article 4 direction applies to your property.

Check with Fareham planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Swimming Pool

Generally permitted. Outdoor swimming pools are considered engineering operations within the curtilage and are permitted provided the pool area (together with all other outbuildings) does not cover more than half the curtilage. An enclosed pool building follows outbuilding rules under Part 1, Class E.

Conditions

  • 1Must be within the curtilage of the dwelling
  • 2Must not cover more than half the curtilage (combined with other outbuildings and extensions)
  • 3If in an enclosed building, standard outbuilding height limits apply
  • 4Must be for purposes incidental to the enjoyment of the dwelling

Size and Dimension Limits

  • No specific pool size limit, but cumulative area must not exceed 50% of curtilage
  • Enclosing structure: same height limits as outbuildings

When Permitted Development Does Not Apply

  • Must not be forward of the principal elevation
  • In designated areas, additional restrictions apply
  • Indoor pool buildings are outbuildings and must comply with Part 1, Class E
  • Consider the impact on drainage and neighbouring properties

What About Building Regulations?

Building regulations approval is not usually required

An outdoor pool does not normally require Building Regulations approval. An indoor pool in an enclosed building may require approval depending on the building's size and whether it has electrical installations, structural elements, or drainage connections. Electrical installations near a pool must comply with Part P and BS 7671 (special requirements for swimming pools).

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Fareham building control or use an approved inspector.

How to Apply in Fareham

If you need planning permission for your swimming pool, you can apply through Fareham's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Fareham Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Fareham. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk for outdoor pools within PD limits. Pools that significantly alter ground levels or drainage may attract investigation. Enclosed pool buildings that exceed outbuilding limits need planning permission.

Frequently Asked Questions

Do I need planning permission for a swimming pool in Fareham?
Generally permitted. Outdoor swimming pools are considered engineering operations within the curtilage and are permitted provided the pool area (together with all other outbuildings) does not cover more than half the curtilage. An enclosed pool building follows outbuilding rules under Part 1, Class E. Note: Fareham has 13 conservation areas (including Cams Hall, Catisfield, Fareham High Street) and Article 4 directions in force where permitted development rights may be restricted. Check with Fareham planning department.
Does a swimming pool in Fareham need building regulations?
Building regulations approval is not usually required for a swimming pool. An outdoor pool does not normally require Building Regulations approval. An indoor pool in an enclosed building may require approval depending on the building's size and whether it has electrical installations, structural elements, or drainage connections. Electrical installations near a pool must comply with Part P and BS 7671 (special requirements for swimming pools).
How do I apply for planning permission in Fareham?
You can apply for planning permission through Fareham's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Fareham?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Fareham decided 99% of applications within the statutory or agreed time, and 89% of householder applications within 8 weeks.
What percentage of planning applications does Fareham approve?
Fareham granted 98% of the 595 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 99%.