This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentBroadland (East of England)

Do I Need Planning Permission for a Satellite Dish in Broadland?

Installing a satellite dish or antenna on your property. Satellite dishes have specific permitted development rights under Part 25 (formerly Part 1, Class H) of the GPDO.

Planning in Broadland

93%

of planning applications granted

88%

decided within the statutory or agreed time

69%

of householder applications decided within 8 weeks

In the year to December 2025, Broadland decided 772 planning applications. 465 of these were householder projects such as extensions, loft conversions and outbuildings, of which 97% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Broadland

Broadland has 29 conservation areas. These include Aylsham, Belaugh, Blickling Conservation Area, Burgh Conservation Area, Catton Conservation Area, Cawston Conservation Area. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Broadland has 28 recorded Article 4 directions. These include Area centred on the Market Place; Broads Authoriity Holly Lodge; Broads Authority; Broads Authority Conservation Area. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Broadland planning department to check whether an Article 4 direction applies to your property.

Check with Broadland planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Satellite Dish

Generally permitted under Part 25, Class A of the GPDO. Conditions apply to the dish size, position, and number of dishes on the property. In designated areas, additional restrictions apply to dishes on chimneys, front elevations, or highway-facing walls.

Conditions

  • 1Maximum dish size: 1m diameter (or 0.6m if mounted on a chimney)
  • 2No dish on a wall or roof slope forming the principal elevation or side elevation fronting a highway
  • 3Maximum of 2 dishes on the property at any one time
  • 4Must not be higher than the highest part of the roof or chimney (whichever is used for mounting)
  • 5Dish must be removed when no longer needed

Size and Dimension Limits

  • Dish diameter: 1m maximum (0.6m on a chimney)
  • Maximum 2 dishes on the property

When Permitted Development Does Not Apply

  • In designated areas (conservation areas, AONB, National Parks, etc.), no dish on a chimney, front wall, or roof slope facing a highway
  • Listed buildings require listed building consent
  • Additional dishes beyond 2 require planning permission
  • Article 4 directions can restrict satellite dish installations

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not apply to satellite dish installation. The dish and bracket must be securely fixed to prevent it becoming detached in high winds. Roof-mounted dishes should ensure the roof remains watertight.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Broadland building control or use an approved inspector.

How to Apply in Broadland

If you need planning permission for your satellite dish, you can apply through Broadland's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Broadland Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Broadland. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk for dishes within PD limits. In conservation areas, dishes on prominent elevations without permission are a common enforcement target. The council can require removal.

Frequently Asked Questions

Do I need planning permission for a satellite dish in Broadland?
Generally permitted under Part 25, Class A of the GPDO. Conditions apply to the dish size, position, and number of dishes on the property. In designated areas, additional restrictions apply to dishes on chimneys, front elevations, or highway-facing walls. Note: Broadland has 29 conservation areas (including Aylsham, Belaugh, Blickling Conservation Area) and 28 recorded Article 4 directions where permitted development rights may be restricted. Check with Broadland planning department.
Does a satellite dish in Broadland need building regulations?
Building regulations approval is not usually required for a satellite dish. Building Regulations do not apply to satellite dish installation. The dish and bracket must be securely fixed to prevent it becoming detached in high winds. Roof-mounted dishes should ensure the roof remains watertight.
How do I apply for planning permission in Broadland?
You can apply for planning permission through Broadland's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Broadland?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Broadland decided 88% of applications within the statutory or agreed time, and 69% of householder applications within 8 weeks.
What percentage of planning applications does Broadland approve?
Broadland granted 93% of the 772 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 97%.

Find an Aerial & Satellite Installer in Broadland

Browse local aerial & satellite installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Satellite Dish rules in nearby council areas

Other projects in Broadland