Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentBexley (London)

Do I Need Planning Permission for a Satellite Dish in Bexley?

Installing a satellite dish or antenna on your property. Satellite dishes have specific permitted development rights under Part 25 (formerly Part 1, Class H) of the GPDO.

Planning in Bexley

89%

of planning applications granted

98%

decided within the statutory or agreed time

88%

of householder applications decided within 8 weeks

In the year to December 2025, Bexley decided 1,314 planning applications. 944 of these were householder projects such as extensions, loft conversions and outbuildings, of which 94% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Bexley

Bexley has 23 conservation areas. These include Brook Street, Christ Church, Crossness, Erith Riverside, Erith Road, Foots Cray. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Bexley planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Satellite Dish

Generally permitted under Part 25, Class A of the GPDO. Conditions apply to the dish size, position, and number of dishes on the property. In designated areas, additional restrictions apply to dishes on chimneys, front elevations, or highway-facing walls.

Conditions

  • 1Maximum dish size: 1m diameter (or 0.6m if mounted on a chimney)
  • 2No dish on a wall or roof slope forming the principal elevation or side elevation fronting a highway
  • 3Maximum of 2 dishes on the property at any one time
  • 4Must not be higher than the highest part of the roof or chimney (whichever is used for mounting)
  • 5Dish must be removed when no longer needed

Size and Dimension Limits

  • Dish diameter: 1m maximum (0.6m on a chimney)
  • Maximum 2 dishes on the property

When Permitted Development Does Not Apply

  • In designated areas (conservation areas, AONB, National Parks, etc.), no dish on a chimney, front wall, or roof slope facing a highway
  • Listed buildings require listed building consent
  • Additional dishes beyond 2 require planning permission
  • Article 4 directions can restrict satellite dish installations

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not apply to satellite dish installation. The dish and bracket must be securely fixed to prevent it becoming detached in high winds. Roof-mounted dishes should ensure the roof remains watertight.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Bexley building control or use an approved inspector.

How to Apply in Bexley

If you need planning permission for your satellite dish, you can apply through Bexley's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Bexley Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Bexley. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk for dishes within PD limits. In conservation areas, dishes on prominent elevations without permission are a common enforcement target. The council can require removal.

Frequently Asked Questions

Do I need planning permission for a satellite dish in Bexley?
Generally permitted under Part 25, Class A of the GPDO. Conditions apply to the dish size, position, and number of dishes on the property. In designated areas, additional restrictions apply to dishes on chimneys, front elevations, or highway-facing walls. Note: Bexley has 23 conservation areas (including Brook Street, Christ Church, Crossness) where permitted development rights may be restricted. Check with Bexley planning department.
Does a satellite dish in Bexley need building regulations?
Building regulations approval is not usually required for a satellite dish. Building Regulations do not apply to satellite dish installation. The dish and bracket must be securely fixed to prevent it becoming detached in high winds. Roof-mounted dishes should ensure the roof remains watertight.
How do I apply for planning permission in Bexley?
You can apply for planning permission through Bexley's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Bexley?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Bexley decided 98% of applications within the statutory or agreed time, and 88% of householder applications within 8 weeks.
What percentage of planning applications does Bexley approve?
Bexley granted 89% of the 1,314 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 94%.

Find an Aerial & Satellite Installer in Bexley

Browse local aerial & satellite installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Satellite Dish rules in nearby council areas

Other projects in Bexley