Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentWindsor and Maidenhead (South East)

Do I Need Planning Permission for Roof Windows (Velux) in Windsor and Maidenhead?

Installing roof windows (also known as Velux windows or skylights) into an existing roof slope. Roof windows are a popular way to bring light into loft spaces without the cost of a full dormer.

Planning in Windsor and Maidenhead

69%

of planning applications granted

93%

decided within the statutory or agreed time

72%

of householder applications decided within 8 weeks

In the year to December 2025, Windsor and Maidenhead decided 1,576 planning applications. 1,008 of these were householder projects such as extensions, loft conversions and outbuildings, of which 70% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Windsor and Maidenhead

Windsor and Maidenhead has conservation areas. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Windsor and Maidenhead has Article 4 directions in force. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Windsor and Maidenhead planning department to check whether an Article 4 direction applies to your property.

Check with Windsor and Maidenhead planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for Roof Windows (Velux)

Generally permitted under Part 1, Class C of the GPDO. Roof windows are permitted provided they do not protrude more than 150mm beyond the plane of the roof slope. Side-facing windows at upper-floor level must be obscure glazed and non-opening below 1.7m from the floor.

Conditions

  • 1Must not protrude more than 150mm beyond the existing roof plane
  • 2Side-facing windows (on a wall or roof slope forming a side elevation) must be obscure glazed and non-opening below 1.7m from the floor
  • 3The window must not result in the roof exceeding the existing ridge height

Size and Dimension Limits

  • Protrusion: maximum 150mm beyond the roof plane
  • No specific size limit for individual windows

When Permitted Development Does Not Apply

  • In conservation areas, roof windows on the principal or highway-facing elevation may not be PD
  • Listed buildings require listed building consent
  • Multiple roof windows may cumulatively change the character of the roof, potentially requiring PP

What About Building Regulations?

Building regulations approval is likely required

Building Regulations may apply depending on the structural alteration to the roof. Covers structural integrity of the roof after cutting rafters, thermal performance (Part L), and fire safety (means of escape if the room is a habitable loft). A FENSA-registered installer or building control notification is needed for the glazing.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Windsor and Maidenhead building control or use an approved inspector.

How to Apply in Windsor and Maidenhead

If you need planning permission for your roof windows (velux), you can apply through Windsor and Maidenhead's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Windsor and Maidenhead Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Windsor and Maidenhead. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk for standard roof windows within PD limits. Enforcement may occur if windows overlook neighbouring properties without being obscure glazed where required, or in conservation areas without consent.

Frequently Asked Questions

Do I need planning permission for roof windows (velux) in Windsor and Maidenhead?
Generally permitted under Part 1, Class C of the GPDO. Roof windows are permitted provided they do not protrude more than 150mm beyond the plane of the roof slope. Side-facing windows at upper-floor level must be obscure glazed and non-opening below 1.7m from the floor. Note: Windsor and Maidenhead has conservation areas and Article 4 directions which may restrict permitted development rights in some areas. Check with Windsor and Maidenhead planning department.
Does roof windows (velux) in Windsor and Maidenhead need building regulations?
Yes. Building Regulations may apply depending on the structural alteration to the roof. Covers structural integrity of the roof after cutting rafters, thermal performance (Part L), and fire safety (means of escape if the room is a habitable loft). A FENSA-registered installer or building control notification is needed for the glazing. Contact Windsor and Maidenhead building control or an approved inspector for details.
How do I apply for planning permission in Windsor and Maidenhead?
You can apply for planning permission through Windsor and Maidenhead's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Windsor and Maidenhead?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Windsor and Maidenhead decided 93% of applications within the statutory or agreed time, and 72% of householder applications within 8 weeks.
What percentage of planning applications does Windsor and Maidenhead approve?
Windsor and Maidenhead granted 69% of the 1,576 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 70%.

Find a Roofer in Windsor and Maidenhead

Browse local roofers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Roof Windows (Velux) rules in nearby council areas

Other projects in Windsor and Maidenhead