Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentAdur (South East)

Do I Need Planning Permission for Roof Windows (Velux) in Adur?

Installing roof windows (also known as Velux windows or skylights) into an existing roof slope. Roof windows are a popular way to bring light into loft spaces without the cost of a full dormer.

Planning in Adur

92%

of planning applications granted

93%

decided within the statutory or agreed time

59%

of householder applications decided within 8 weeks

In the year to December 2025, Adur decided 310 planning applications. 213 of these were householder projects such as extensions, loft conversions and outbuildings, of which 95% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Adur

Adur has 7 conservation areas. These include Kingston Buci, North Lancing, Old Shoreham, Shoreham-by-Sea, Sompting, Southlands. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Adur has 9 recorded Article 4 directions. These include Church Street, Shoreham-by-Sea; Kingston Buci Conservation Area; Land adjoining Steyning Road, Shoreham-by-Sea; Land at Southwick Old Rectory, Kingston Lane, Southwick. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Adur planning department to check whether an Article 4 direction applies to your property.

Check with Adur planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for Roof Windows (Velux)

Generally permitted under Part 1, Class C of the GPDO. Roof windows are permitted provided they do not protrude more than 150mm beyond the plane of the roof slope. Side-facing windows at upper-floor level must be obscure glazed and non-opening below 1.7m from the floor.

Conditions

  • 1Must not protrude more than 150mm beyond the existing roof plane
  • 2Side-facing windows (on a wall or roof slope forming a side elevation) must be obscure glazed and non-opening below 1.7m from the floor
  • 3The window must not result in the roof exceeding the existing ridge height

Size and Dimension Limits

  • Protrusion: maximum 150mm beyond the roof plane
  • No specific size limit for individual windows

When Permitted Development Does Not Apply

  • In conservation areas, roof windows on the principal or highway-facing elevation may not be PD
  • Listed buildings require listed building consent
  • Multiple roof windows may cumulatively change the character of the roof, potentially requiring PP

What About Building Regulations?

Building regulations approval is likely required

Building Regulations may apply depending on the structural alteration to the roof. Covers structural integrity of the roof after cutting rafters, thermal performance (Part L), and fire safety (means of escape if the room is a habitable loft). A FENSA-registered installer or building control notification is needed for the glazing.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Adur building control or use an approved inspector.

How to Apply in Adur

If you need planning permission for your roof windows (velux), you can apply through Adur's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Adur Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Adur. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk for standard roof windows within PD limits. Enforcement may occur if windows overlook neighbouring properties without being obscure glazed where required, or in conservation areas without consent.

Frequently Asked Questions

Do I need planning permission for roof windows (velux) in Adur?
Generally permitted under Part 1, Class C of the GPDO. Roof windows are permitted provided they do not protrude more than 150mm beyond the plane of the roof slope. Side-facing windows at upper-floor level must be obscure glazed and non-opening below 1.7m from the floor. Note: Adur has 7 conservation areas (including Kingston Buci, North Lancing, Old Shoreham) and 9 recorded Article 4 directions where permitted development rights may be restricted. Check with Adur planning department.
Does roof windows (velux) in Adur need building regulations?
Yes. Building Regulations may apply depending on the structural alteration to the roof. Covers structural integrity of the roof after cutting rafters, thermal performance (Part L), and fire safety (means of escape if the room is a habitable loft). A FENSA-registered installer or building control notification is needed for the glazing. Contact Adur building control or an approved inspector for details.
How do I apply for planning permission in Adur?
You can apply for planning permission through Adur's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Adur?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Adur decided 93% of applications within the statutory or agreed time, and 59% of householder applications within 8 weeks.
What percentage of planning applications does Adur approve?
Adur granted 92% of the 310 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 95%.

Find a Roofer in Adur

Browse local roofers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Roof Windows (Velux) rules in nearby council areas

Other projects in Adur