Do I Need Planning Permission for a Retaining Wall in North Somerset?

A wall built to hold back earth and manage changes in ground level. Small retaining walls may be permitted development, but larger walls that significantly alter ground levels are likely to need planning permission.

Planning in North Somerset

88%

of planning applications granted

86%

decided within the statutory or agreed time

69%

of householder applications decided within 8 weeks

In the year to December 2025, North Somerset decided 1,148 planning applications. 652 of these were householder projects such as extensions, loft conversions and outbuildings, of which 91% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in North Somerset

North Somerset has 39 conservation areas. These include Backwell Church Town, Backwell Farleigh, Backwell West Town, Banwell, Barrow Gurney, Beach Lawns. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

North Somerset has 38 recorded Article 4 directions. These include Agricultural land at Weston-in-Gordano; Great Weston Conservation Area, Weston-super-Mare; Land at Backwell; Land at Blackmoor Road, Abbots Leigh. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact North Somerset planning department to check whether an Article 4 direction applies to your property.

Check with North Somerset planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Retaining Wall

Whether a retaining wall needs planning permission depends on its size and the extent of ground-level change. Small retaining walls (under 1m height of retained earth) are generally treated as engineering operations within the curtilage and may be PD. Larger retaining walls that significantly alter ground levels are likely to require a planning application.

Conditions

  • 1Small retaining walls may be PD as engineering operations within the curtilage
  • 2The height of a retaining wall is measured from the lower ground level, not the higher
  • 3If the retaining wall also acts as a boundary wall, the combined height limit of 2m (or 1m near a highway) applies
  • 4Must not cause drainage issues for neighbouring properties

Size and Dimension Limits

  • No specific PD height for retaining walls; LPA interpretation varies
  • If acting as a boundary: 2m maximum (1m adjacent to highway)

When Permitted Development Does Not Apply

  • Significant changes to ground levels usually require planning permission
  • Party wall agreements may apply if near a boundary
  • Structural design is critical; poorly designed retaining walls can fail dangerously
  • Drainage behind the wall (weep holes or land drains) is essential

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not formally apply to garden retaining walls. However, structural engineering design is strongly recommended for walls retaining more than 600mm of earth. Failure of a retaining wall can cause injury or property damage, and the homeowner is liable.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact North Somerset building control or use an approved inspector.

How to Apply in North Somerset

If you need planning permission for your retaining wall, you can apply through North Somerset's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit North Somerset Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from North Somerset. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Moderate risk for large retaining walls that significantly alter ground levels. Enforcement can require removal or alteration of the wall. Failed retaining walls that cause damage to neighbouring properties create civil liability for the homeowner.

Frequently Asked Questions

Do I need planning permission for a retaining wall in North Somerset?
Whether a retaining wall needs planning permission depends on its size and the extent of ground-level change. Small retaining walls (under 1m height of retained earth) are generally treated as engineering operations within the curtilage and may be PD. Larger retaining walls that significantly alter ground levels are likely to require a planning application. Note: North Somerset has 39 conservation areas (including Backwell Church Town, Backwell Farleigh, Backwell West Town) and 38 recorded Article 4 directions where permitted development rights may be restricted. Check with North Somerset planning department.
Does a retaining wall in North Somerset need building regulations?
Building regulations approval is not usually required for a retaining wall. Building Regulations do not formally apply to garden retaining walls. However, structural engineering design is strongly recommended for walls retaining more than 600mm of earth. Failure of a retaining wall can cause injury or property damage, and the homeowner is liable.
How do I apply for planning permission in North Somerset?
You can apply for planning permission through North Somerset's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in North Somerset?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, North Somerset decided 86% of applications within the statutory or agreed time, and 69% of householder applications within 8 weeks.
What percentage of planning applications does North Somerset approve?
North Somerset granted 88% of the 1,148 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 91%.