Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentSalford (North West)

Do I Need Planning Permission for a Patio or Paved Area in Salford?

Laying a patio, paved area, or hard surface in your rear garden. Patios are generally permitted as garden improvements with no planning requirements, though front garden paving has specific drainage rules.

Planning in Salford

90%

of planning applications granted

94%

decided within the statutory or agreed time

53%

of householder applications decided within 8 weeks

In the year to December 2025, Salford decided 783 planning applications. 400 of these were householder projects such as extensions, loft conversions and outbuildings, of which 95% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Salford

Salford has 16 conservation areas. These include Adelphi Bexley Square conservation area, Barton-upon-Irwell conservation area, Cathedral conservation area, Cliff conservation area, Crescent conservation area, Ellesmere Park conservation area. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Salford has 3 recorded Article 4 directions. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Salford planning department to check whether an Article 4 direction applies to your property.

Check with Salford planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Patio or Paved Area

Generally permitted. Laying a patio or hard surface in the rear garden is permitted development as an improvement within the curtilage. Front garden hard surfaces are PD if the surface is permeable or drains to a permeable area within the curtilage.

Conditions

  • 1Rear garden patios are generally PD without specific conditions
  • 2Front garden: must use permeable paving or drain to a permeable area within the garden
  • 3Must not significantly raise the ground level (over 300mm becomes a raised platform)
  • 4Good drainage practice to prevent flooding and waterlogging

Size and Dimension Limits

  • No specific size limit for rear garden patios
  • Front garden: non-permeable surfaces over 5 square metres require PP if not draining to a permeable area

When Permitted Development Does Not Apply

  • Front garden non-permeable paving over 5 square metres requires planning permission (since 2008)
  • Listed buildings may require consent for changes within their curtilage
  • Raised patios over 300mm above ground level may need PP (treated as raised platforms)

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not apply to standard patios. There are no structural, thermal, or fire safety requirements. Drainage should be managed to prevent water pooling against the house (maintaining the damp proof course level).

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Salford building control or use an approved inspector.

How to Apply in Salford

If you need planning permission for your patio or paved area, you can apply through Salford's planning department or via the national Planning Portal.

Timeline:Not applicable for rear garden patios. 8 weeks for front garden applications if PP is needed.
Cost:£258 if planning permission is required.
Visit Salford Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Salford. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low risk for rear garden patios. Front garden non-permeable paving over 5 square metres without proper drainage is an enforcement risk, though enforcement is relatively uncommon in practice.

Frequently Asked Questions

Do I need planning permission for a patio or paved area in Salford?
Generally permitted. Laying a patio or hard surface in the rear garden is permitted development as an improvement within the curtilage. Front garden hard surfaces are PD if the surface is permeable or drains to a permeable area within the curtilage. Note: Salford has 16 conservation areas (including Adelphi Bexley Square conservation area, Barton-upon-Irwell conservation area, Cathedral conservation area) and 3 recorded Article 4 directions where permitted development rights may be restricted. Check with Salford planning department.
Does a patio or paved area in Salford need building regulations?
Building regulations approval is not usually required for a patio or paved area. Building Regulations do not apply to standard patios. There are no structural, thermal, or fire safety requirements. Drainage should be managed to prevent water pooling against the house (maintaining the damp proof course level).
How do I apply for planning permission in Salford?
You can apply for planning permission through Salford's planning department or via the national Planning Portal. £258 if planning permission is required.. Not applicable for rear garden patios. 8 weeks for front garden applications if PP is needed..
How long does planning permission take in Salford?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Salford decided 94% of applications within the statutory or agreed time, and 53% of householder applications within 8 weeks.
What percentage of planning applications does Salford approve?
Salford granted 90% of the 783 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 95%.

Find a Paving Specialist in Salford

Browse local paving specialists on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Patio or Paved Area rules in nearby council areas

Other projects in Salford