Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentSouthwark (London)

Do I Need Planning Permission for a General Outbuilding in Southwark?

Any detached building within the grounds of your home used for purposes incidental to the dwelling, such as storage, a workshop, a gym, or a games room. This covers the general outbuilding rules under the GPDO.

Planning in Southwark

91%

of planning applications granted

96%

decided within the statutory or agreed time

80%

of householder applications decided within 8 weeks

In the year to December 2025, Southwark decided 1,589 planning applications. 591 of these were householder projects such as extensions, loft conversions and outbuildings, of which 95% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Southwark

Southwark has 53 conservation areas. These include Addington Square, Bear Gardens, Bermondsey Street, Borough High Street, Camberwell Green, Camberwell Grove. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Southwark has 480 recorded Article 4 directions. These include Albion Public House; Alleyns Head; Anchor Tap; Ancient Foresters. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Southwark planning department to check whether an Article 4 direction applies to your property.

Check with Southwark planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a General Outbuilding

Generally permitted under Part 1, Class E of the GPDO. Outbuildings must be for purposes incidental to the enjoyment of the dwelling and must comply with height, position, and area limits.

Conditions

  • 1Must be for purposes incidental to the enjoyment of the dwelling
  • 2Must not be forward of the principal elevation fronting a highway
  • 3Maximum height 2.5m if within 2m of a boundary
  • 4Maximum height 4m (dual-pitch roof) or 3m (any other roof) if more than 2m from a boundary
  • 5Must not cover more than half the curtilage (all outbuildings and extensions combined)

Size and Dimension Limits

  • Height within 2m of boundary: 2.5m maximum
  • Height elsewhere: 4m (dual pitch) or 3m (other roofs)
  • No single footprint limit, but cumulative total must not exceed 50% of curtilage

When Permitted Development Does Not Apply

  • In designated areas, outbuildings to the side of the house are not PD
  • In designated areas, total outbuilding area exceeding 10 square metres requires PP
  • Must not be used as sleeping accommodation or a separate dwelling
  • Total cumulative outbuilding footprint (including sheds, summer houses, etc.) counts towards the 50% limit

What About Building Regulations?

Building regulations approval is not usually required

Under 15 square metres with no sleeping accommodation: normally exempt. Between 15 and 30 square metres: must be at least 1m from any boundary or constructed of substantially non-combustible materials. Over 30 square metres: Building Regulations apply in full.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Southwark building control or use an approved inspector.

How to Apply in Southwark

If you need planning permission for your general outbuilding, you can apply through Southwark's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Southwark Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Southwark. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Enforcement risk increases with the size and use of the outbuilding. Large outbuildings that dominate the garden or are used for residential or commercial purposes attract enforcement. Neighbours' complaints are a common trigger for council investigation.

Frequently Asked Questions

Do I need planning permission for a general outbuilding in Southwark?
Generally permitted under Part 1, Class E of the GPDO. Outbuildings must be for purposes incidental to the enjoyment of the dwelling and must comply with height, position, and area limits. Note: Southwark has 53 conservation areas (including Addington Square, Bear Gardens, Bermondsey Street) and 480 recorded Article 4 directions where permitted development rights may be restricted. Check with Southwark planning department.
Does a general outbuilding in Southwark need building regulations?
Building regulations approval is not usually required for a general outbuilding. Under 15 square metres with no sleeping accommodation: normally exempt. Between 15 and 30 square metres: must be at least 1m from any boundary or constructed of substantially non-combustible materials. Over 30 square metres: Building Regulations apply in full.
How do I apply for planning permission in Southwark?
You can apply for planning permission through Southwark's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Southwark?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Southwark decided 96% of applications within the statutory or agreed time, and 80% of householder applications within 8 weeks.
What percentage of planning applications does Southwark approve?
Southwark granted 91% of the 1,589 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 95%.

Find a Builder in Southwark

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

General Outbuilding rules in nearby council areas

Other projects in Southwark