Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentHaringey (London)

Do I Need Planning Permission for a General Outbuilding in Haringey?

Any detached building within the grounds of your home used for purposes incidental to the dwelling, such as storage, a workshop, a gym, or a games room. This covers the general outbuilding rules under the GPDO.

Planning in Haringey

85%

of planning applications granted

88%

decided within the statutory or agreed time

56%

of householder applications decided within 8 weeks

In the year to December 2025, Haringey decided 1,414 planning applications. 700 of these were householder projects such as extensions, loft conversions and outbuildings, of which 91% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Haringey

Haringey has 33 conservation areas. These include Alexandra Palace and Park, Bowes Park, Bruce Castle, Campsbourne Cottage Estate, Clyde Circus, Crouch End. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Haringey has 25 recorded Article 4 directions. These include Ashley Rd; Bounds Green Industrial Estate; Brantwood Road; Constable Crescent. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Haringey planning department to check whether an Article 4 direction applies to your property.

Check with Haringey planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a General Outbuilding

Generally permitted under Part 1, Class E of the GPDO. Outbuildings must be for purposes incidental to the enjoyment of the dwelling and must comply with height, position, and area limits.

Conditions

  • 1Must be for purposes incidental to the enjoyment of the dwelling
  • 2Must not be forward of the principal elevation fronting a highway
  • 3Maximum height 2.5m if within 2m of a boundary
  • 4Maximum height 4m (dual-pitch roof) or 3m (any other roof) if more than 2m from a boundary
  • 5Must not cover more than half the curtilage (all outbuildings and extensions combined)

Size and Dimension Limits

  • Height within 2m of boundary: 2.5m maximum
  • Height elsewhere: 4m (dual pitch) or 3m (other roofs)
  • No single footprint limit, but cumulative total must not exceed 50% of curtilage

When Permitted Development Does Not Apply

  • In designated areas, outbuildings to the side of the house are not PD
  • In designated areas, total outbuilding area exceeding 10 square metres requires PP
  • Must not be used as sleeping accommodation or a separate dwelling
  • Total cumulative outbuilding footprint (including sheds, summer houses, etc.) counts towards the 50% limit

What About Building Regulations?

Building regulations approval is not usually required

Under 15 square metres with no sleeping accommodation: normally exempt. Between 15 and 30 square metres: must be at least 1m from any boundary or constructed of substantially non-combustible materials. Over 30 square metres: Building Regulations apply in full.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Haringey building control or use an approved inspector.

How to Apply in Haringey

If you need planning permission for your general outbuilding, you can apply through Haringey's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Haringey Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Haringey. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Enforcement risk increases with the size and use of the outbuilding. Large outbuildings that dominate the garden or are used for residential or commercial purposes attract enforcement. Neighbours' complaints are a common trigger for council investigation.

Frequently Asked Questions

Do I need planning permission for a general outbuilding in Haringey?
Generally permitted under Part 1, Class E of the GPDO. Outbuildings must be for purposes incidental to the enjoyment of the dwelling and must comply with height, position, and area limits. Note: Haringey has 33 conservation areas (including Alexandra Palace and Park, Bowes Park, Bruce Castle) and 25 recorded Article 4 directions where permitted development rights may be restricted. Check with Haringey planning department.
Does a general outbuilding in Haringey need building regulations?
Building regulations approval is not usually required for a general outbuilding. Under 15 square metres with no sleeping accommodation: normally exempt. Between 15 and 30 square metres: must be at least 1m from any boundary or constructed of substantially non-combustible materials. Over 30 square metres: Building Regulations apply in full.
How do I apply for planning permission in Haringey?
You can apply for planning permission through Haringey's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Haringey?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Haringey decided 88% of applications within the statutory or agreed time, and 56% of householder applications within 8 weeks.
What percentage of planning applications does Haringey approve?
Haringey granted 85% of the 1,414 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 91%.

Find a Builder in Haringey

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

General Outbuilding rules in nearby council areas

Other projects in Haringey