Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentDacorum (East of England)

Do I Need Planning Permission for an Orangery in Dacorum?

An orangery is similar to a conservatory but features more solid walls with a glazed lantern roof. For planning purposes, an orangery is treated as a single-storey extension and follows the same permitted development rules.

Planning in Dacorum

89%

of planning applications granted

83%

decided within the statutory or agreed time

76%

of householder applications decided within 8 weeks

In the year to December 2025, Dacorum decided 1,137 planning applications. 718 of these were householder projects such as extensions, loft conversions and outbuildings, of which 91% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Dacorum

Dacorum has 23 conservation areas. These include Aldbury, Berkhamsted, Bovingdon, Chipperfield, Dudswell, Flamsted. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Dacorum planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for an Orangery

Generally permitted under Part 1, Class A, following the same rules as single-storey extensions. An orangery is treated identically to any other single-storey rear extension for PD purposes.

Conditions

  • 1Same conditions as single-storey rear extensions
  • 2Maximum depth 3m (semi/terraced) or 4m (detached) under standard PD
  • 3Maximum height 4m; eaves 3m if within 2m of boundary
  • 4Materials should be similar in appearance to the existing dwelling
  • 5Must not cover more than half the curtilage

Size and Dimension Limits

  • Maximum height: 4m
  • Eaves height: 3m if within 2m of a boundary
  • Depth: 3m (semi/terraced) or 4m (detached) under standard PD

When Permitted Development Does Not Apply

  • Same limitations as single-storey extensions
  • Cumulative total of all extensions and outbuildings must not cover more than half the curtilage
  • Unlike conservatories, orangeries are unlikely to qualify for the Building Regulations exemption (due to solid walls)

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval is usually required as orangeries have substantial masonry walls and are generally integrated into the house. Covers structural stability, foundations, thermal performance (Part L), ventilation, drainage, and electrical installations.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Dacorum building control or use an approved inspector.

How to Apply in Dacorum

If you need planning permission for your orangery, you can apply through Dacorum's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Dacorum Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Dacorum. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Same enforcement risk as single-storey extensions. Orangeries that exceed PD limits without permission can be subject to enforcement notices requiring alteration or removal.

Frequently Asked Questions

Do I need planning permission for an orangery in Dacorum?
Generally permitted under Part 1, Class A, following the same rules as single-storey extensions. An orangery is treated identically to any other single-storey rear extension for PD purposes. Note: Dacorum has 23 conservation areas (including Aldbury, Berkhamsted, Bovingdon) where permitted development rights may be restricted. Check with Dacorum planning department.
Does an orangery in Dacorum need building regulations?
Yes. Building Regulations approval is usually required as orangeries have substantial masonry walls and are generally integrated into the house. Covers structural stability, foundations, thermal performance (Part L), ventilation, drainage, and electrical installations. Contact Dacorum building control or an approved inspector for details.
How do I apply for planning permission in Dacorum?
You can apply for planning permission through Dacorum's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Dacorum?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Dacorum decided 83% of applications within the statutory or agreed time, and 76% of householder applications within 8 weeks.
What percentage of planning applications does Dacorum approve?
Dacorum granted 89% of the 1,137 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 91%.

Find a Builder in Dacorum

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Orangery rules in nearby council areas

Other projects in Dacorum