Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentAshford (South East)

Do I Need Planning Permission for an Orangery in Ashford?

An orangery is similar to a conservatory but features more solid walls with a glazed lantern roof. For planning purposes, an orangery is treated as a single-storey extension and follows the same permitted development rules.

Planning in Ashford

87%

of planning applications granted

96%

decided within the statutory or agreed time

79%

of householder applications decided within 8 weeks

In the year to December 2025, Ashford decided 1,007 planning applications. 467 of these were householder projects such as extensions, loft conversions and outbuildings, of which 91% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Ashford

Ashford has 44 conservation areas. These include Aldington - Church Area, Aldington - Clap Hill, Appledore, Ashford - Lacton Green, Ashford - Queens Road, Ashford - Town Centre. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Ashford has 73 recorded Article 4 directions. These include Caravans/agriculture/forestry; Construction of A Slurry Lagoon; Enlargement of a dwelling house; Erection and Formation of Fences. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Ashford planning department to check whether an Article 4 direction applies to your property.

Check with Ashford planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for an Orangery

Generally permitted under Part 1, Class A, following the same rules as single-storey extensions. An orangery is treated identically to any other single-storey rear extension for PD purposes.

Conditions

  • 1Same conditions as single-storey rear extensions
  • 2Maximum depth 3m (semi/terraced) or 4m (detached) under standard PD
  • 3Maximum height 4m; eaves 3m if within 2m of boundary
  • 4Materials should be similar in appearance to the existing dwelling
  • 5Must not cover more than half the curtilage

Size and Dimension Limits

  • Maximum height: 4m
  • Eaves height: 3m if within 2m of a boundary
  • Depth: 3m (semi/terraced) or 4m (detached) under standard PD

When Permitted Development Does Not Apply

  • Same limitations as single-storey extensions
  • Cumulative total of all extensions and outbuildings must not cover more than half the curtilage
  • Unlike conservatories, orangeries are unlikely to qualify for the Building Regulations exemption (due to solid walls)

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval is usually required as orangeries have substantial masonry walls and are generally integrated into the house. Covers structural stability, foundations, thermal performance (Part L), ventilation, drainage, and electrical installations.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Ashford building control or use an approved inspector.

How to Apply in Ashford

If you need planning permission for your orangery, you can apply through Ashford's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Ashford Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Ashford. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Same enforcement risk as single-storey extensions. Orangeries that exceed PD limits without permission can be subject to enforcement notices requiring alteration or removal.

Frequently Asked Questions

Do I need planning permission for an orangery in Ashford?
Generally permitted under Part 1, Class A, following the same rules as single-storey extensions. An orangery is treated identically to any other single-storey rear extension for PD purposes. Note: Ashford has 44 conservation areas (including Aldington - Church Area, Aldington - Clap Hill, Appledore) and 73 recorded Article 4 directions where permitted development rights may be restricted. Check with Ashford planning department.
Does an orangery in Ashford need building regulations?
Yes. Building Regulations approval is usually required as orangeries have substantial masonry walls and are generally integrated into the house. Covers structural stability, foundations, thermal performance (Part L), ventilation, drainage, and electrical installations. Contact Ashford building control or an approved inspector for details.
How do I apply for planning permission in Ashford?
You can apply for planning permission through Ashford's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Ashford?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Ashford decided 96% of applications within the statutory or agreed time, and 79% of householder applications within 8 weeks.
What percentage of planning applications does Ashford approve?
Ashford granted 87% of the 1,007 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 91%.

Find a Builder in Ashford

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Orangery rules in nearby council areas

Other projects in Ashford