This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentHarlow (East of England)

Do I Need Planning Permission for an Oil Tank Installation in Harlow?

Installing a domestic oil storage tank for heating oil. Oil tanks are treated as outbuildings under permitted development and have specific conditions regarding capacity and position.

Planning in Harlow

81%

of planning applications granted

89%

decided within the statutory or agreed time

65%

of householder applications decided within 8 weeks

In the year to December 2025, Harlow decided 275 planning applications. 141 of these were householder projects such as extensions, loft conversions and outbuildings, of which 77% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Harlow

Harlow has 10 conservation areas. These include Churchgate Street, Harlow Garden Village Estate, Harlow Mill and Old Road North, Harlowbury, Mark Hall North, Netteswellbury. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Harlow has 14 recorded Article 4 directions. These include Churchgate Street; Field House and Goodman House (Burnt Mill Industrial Estate); HMO - townwide; Mark Hall North (Mark Hall North Conservation Area). Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Harlow planning department to check whether an Article 4 direction applies to your property.

Check with Harlow planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for an Oil Tank Installation

Generally permitted under Part 1, Class E of the GPDO (as an outbuilding). Oil tanks up to 3,500 litres are PD provided they are not between the dwelling and a highway, comply with outbuilding height limits, and do not cover more than half the curtilage.

Conditions

  • 1Maximum capacity: 3,500 litres
  • 2Must not be between the dwelling and a highway
  • 3Must comply with outbuilding PD height limits
  • 4Must not cover more than half the curtilage (combined total)
  • 5Must be sited in accordance with OFTEC guidelines for fire safety and environmental protection

Size and Dimension Limits

  • Capacity: 3,500 litres maximum
  • Height: same as outbuildings (2.5m within 2m of boundary; 4m/3m elsewhere)

When Permitted Development Does Not Apply

  • Tanks over 3,500 litres are not PD
  • Must not be forward of the principal elevation
  • Environmental regulations apply to prevent oil spills (Oil Storage Regulations 2001)
  • Secondary containment (bunding) is required for tanks over 200 litres in certain areas

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply under Part J (combustion appliances and fuel storage). Covers tank construction, bunding and secondary containment, fire separation distances from buildings, ventilation, and oil supply pipework. An OFTEC-registered installer can self-certify the work.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Harlow building control or use an approved inspector.

How to Apply in Harlow

If you need planning permission for your oil tank installation, you can apply through Harlow's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Harlow Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Harlow. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low planning enforcement risk for tanks within PD limits. Environmental enforcement is a greater concern: oil spills from poorly installed or maintained tanks can result in prosecution by the Environment Agency and clean-up costs of tens of thousands of pounds.

Frequently Asked Questions

Do I need planning permission for an oil tank installation in Harlow?
Generally permitted under Part 1, Class E of the GPDO (as an outbuilding). Oil tanks up to 3,500 litres are PD provided they are not between the dwelling and a highway, comply with outbuilding height limits, and do not cover more than half the curtilage. Note: Harlow has 10 conservation areas (including Churchgate Street, Harlow Garden Village Estate, Harlow Mill and Old Road North) and 14 recorded Article 4 directions where permitted development rights may be restricted. Check with Harlow planning department.
Does an oil tank installation in Harlow need building regulations?
Yes. Building Regulations apply under Part J (combustion appliances and fuel storage). Covers tank construction, bunding and secondary containment, fire separation distances from buildings, ventilation, and oil supply pipework. An OFTEC-registered installer can self-certify the work. Contact Harlow building control or an approved inspector for details.
How do I apply for planning permission in Harlow?
You can apply for planning permission through Harlow's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Harlow?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Harlow decided 89% of applications within the statutory or agreed time, and 65% of householder applications within 8 weeks.
What percentage of planning applications does Harlow approve?
Harlow granted 81% of the 275 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 77%.