This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentForest of Dean (South West)

Do I Need Planning Permission for an Oil Tank Installation in Forest of Dean?

Installing a domestic oil storage tank for heating oil. Oil tanks are treated as outbuildings under permitted development and have specific conditions regarding capacity and position.

Planning in Forest of Dean

92%

of planning applications granted

95%

decided within the statutory or agreed time

65%

of householder applications decided within 8 weeks

In the year to December 2025, Forest of Dean decided 596 planning applications. 305 of these were householder projects such as extensions, loft conversions and outbuildings, of which 98% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Forest of Dean

Forest of Dean has 27 conservation areas. These include Alvington Conservation Area, Awre Conservation Area, Aylburton Conservation Area, Blaisdon Conservation Area, Blakeney Conservation Area, Brockweir Conservation Area. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Forest of Dean has Article 4 directions in force. These include Newnham (within conservation area). Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Forest of Dean planning department to check whether an Article 4 direction applies to your property.

Check with Forest of Dean planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for an Oil Tank Installation

Generally permitted under Part 1, Class E of the GPDO (as an outbuilding). Oil tanks up to 3,500 litres are PD provided they are not between the dwelling and a highway, comply with outbuilding height limits, and do not cover more than half the curtilage.

Conditions

  • 1Maximum capacity: 3,500 litres
  • 2Must not be between the dwelling and a highway
  • 3Must comply with outbuilding PD height limits
  • 4Must not cover more than half the curtilage (combined total)
  • 5Must be sited in accordance with OFTEC guidelines for fire safety and environmental protection

Size and Dimension Limits

  • Capacity: 3,500 litres maximum
  • Height: same as outbuildings (2.5m within 2m of boundary; 4m/3m elsewhere)

When Permitted Development Does Not Apply

  • Tanks over 3,500 litres are not PD
  • Must not be forward of the principal elevation
  • Environmental regulations apply to prevent oil spills (Oil Storage Regulations 2001)
  • Secondary containment (bunding) is required for tanks over 200 litres in certain areas

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply under Part J (combustion appliances and fuel storage). Covers tank construction, bunding and secondary containment, fire separation distances from buildings, ventilation, and oil supply pipework. An OFTEC-registered installer can self-certify the work.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Forest of Dean building control or use an approved inspector.

How to Apply in Forest of Dean

If you need planning permission for your oil tank installation, you can apply through Forest of Dean's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Forest of Dean Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Forest of Dean. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low planning enforcement risk for tanks within PD limits. Environmental enforcement is a greater concern: oil spills from poorly installed or maintained tanks can result in prosecution by the Environment Agency and clean-up costs of tens of thousands of pounds.

Frequently Asked Questions

Do I need planning permission for an oil tank installation in Forest of Dean?
Generally permitted under Part 1, Class E of the GPDO (as an outbuilding). Oil tanks up to 3,500 litres are PD provided they are not between the dwelling and a highway, comply with outbuilding height limits, and do not cover more than half the curtilage. Note: Forest of Dean has 27 conservation areas (including Alvington Conservation Area, Awre Conservation Area, Aylburton Conservation Area) and Article 4 directions in force where permitted development rights may be restricted. Check with Forest of Dean planning department.
Does an oil tank installation in Forest of Dean need building regulations?
Yes. Building Regulations apply under Part J (combustion appliances and fuel storage). Covers tank construction, bunding and secondary containment, fire separation distances from buildings, ventilation, and oil supply pipework. An OFTEC-registered installer can self-certify the work. Contact Forest of Dean building control or an approved inspector for details.
How do I apply for planning permission in Forest of Dean?
You can apply for planning permission through Forest of Dean's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Forest of Dean?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Forest of Dean decided 95% of applications within the statutory or agreed time, and 65% of householder applications within 8 weeks.
What percentage of planning applications does Forest of Dean approve?
Forest of Dean granted 92% of the 596 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 98%.

Find a Heating Engineer in Forest of Dean

Browse local heating engineers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Oil Tank Installation rules in nearby council areas

Other projects in Forest of Dean