Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Depends on Your Specific SituationLichfield (West Midlands)

Do I Need Planning Permission for New Window Openings in Lichfield?

Creating new window openings in existing walls where none previously existed. This is generally permitted but side-facing windows at upper-floor level have specific restrictions to protect neighbours' privacy.

Planning in Lichfield

80%

of planning applications granted

97%

decided within the statutory or agreed time

96%

of householder applications decided within 8 weeks

In the year to December 2025, Lichfield decided 718 planning applications. 375 of these were householder projects such as extensions, loft conversions and outbuildings, of which 82% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Lichfield

Lichfield has 21 conservation areas. These include Alrewas, Clifton Campville, Colton, Elford, Fazeley and Bonehill, Fradley Junction. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Lichfield has Article 4 directions in force. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Lichfield planning department to check whether an Article 4 direction applies to your property.

Check with Lichfield planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for New Window Openings

Adding new windows to existing walls is generally permitted under Part 1, Class A, provided the windows do not overlook neighbouring properties. Side-facing upper-floor windows must be obscure glazed and non-opening below 1.7m from the floor. New windows in the front elevation may change the building's appearance and could need PP in some areas.

Conditions

  • 1Side-facing windows at upper-floor level must be obscure glazed and non-opening below 1.7m from the floor
  • 2New windows should not significantly alter the external appearance of the dwelling
  • 3Must comply with Building Regulations (structural, thermal, safety glazing)
  • 4Check if the property has any Article 4 directions restricting window changes

Size and Dimension Limits

  • No specific PD size limits for individual windows
  • Structural lintel and support requirements apply based on wall type and opening size

When Permitted Development Does Not Apply

  • Listed buildings require listed building consent
  • Conservation areas may restrict new openings on visible elevations
  • Overlooking is the most common reason for neighbours to object
  • Creating large new openings in structural walls requires Building Regulations approval

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval is required covering structural support (lintels, padstones), thermal performance of the new window (Part L), safety glazing in critical locations (Part K), security requirements (Part Q, PAS 24), and ventilation (Part F). A structural engineer may be needed for large openings in load-bearing walls.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Lichfield building control or use an approved inspector.

How to Apply in Lichfield

If you need planning permission for your new window openings, you can apply through Lichfield's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Lichfield Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Lichfield. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Moderate risk if the new window overlooks a neighbouring property without being obscure glazed where required. The council can require the window to be altered or blocked up. This is a common source of neighbour disputes and enforcement complaints.

Frequently Asked Questions

Do I need planning permission for new window openings in Lichfield?
Adding new windows to existing walls is generally permitted under Part 1, Class A, provided the windows do not overlook neighbouring properties. Side-facing upper-floor windows must be obscure glazed and non-opening below 1.7m from the floor. New windows in the front elevation may change the building's appearance and could need PP in some areas. Note: Lichfield has 21 conservation areas (including Alrewas, Clifton Campville, Colton) where permitted development rights may be restricted. Check with Lichfield planning department.
Does new window openings in Lichfield need building regulations?
Yes. Building Regulations approval is required covering structural support (lintels, padstones), thermal performance of the new window (Part L), safety glazing in critical locations (Part K), security requirements (Part Q, PAS 24), and ventilation (Part F). A structural engineer may be needed for large openings in load-bearing walls. Contact Lichfield building control or an approved inspector for details.
How do I apply for planning permission in Lichfield?
You can apply for planning permission through Lichfield's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Lichfield?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Lichfield decided 97% of applications within the statutory or agreed time, and 96% of householder applications within 8 weeks.
What percentage of planning applications does Lichfield approve?
Lichfield granted 80% of the 718 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 82%.

Find a Window Fitter in Lichfield

Browse local window fitters on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

New Window Openings rules in nearby council areas

Other projects in Lichfield