This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Depends on Your Specific SituationDerby (East Midlands)

Do I Need Planning Permission for New Window Openings in Derby?

Creating new window openings in existing walls where none previously existed. This is generally permitted but side-facing windows at upper-floor level have specific restrictions to protect neighbours' privacy.

Planning in Derby

91%

of planning applications granted

88%

decided within the statutory or agreed time

42%

of householder applications decided within 8 weeks

In the year to December 2025, Derby decided 937 planning applications. 498 of these were householder projects such as extensions, loft conversions and outbuildings, of which 91% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Derby

Derby has 15 conservation areas. These include Allestree, Arboretum, City Centre, Darley Abbey, Friar Gate, Hartington Street. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Derby has Article 4 directions in force. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Derby planning department to check whether an Article 4 direction applies to your property.

Check with Derby planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for New Window Openings

Adding new windows to existing walls is generally permitted under Part 1, Class A, provided the windows do not overlook neighbouring properties. Side-facing upper-floor windows must be obscure glazed and non-opening below 1.7m from the floor. New windows in the front elevation may change the building's appearance and could need PP in some areas.

Conditions

  • 1Side-facing windows at upper-floor level must be obscure glazed and non-opening below 1.7m from the floor
  • 2New windows should not significantly alter the external appearance of the dwelling
  • 3Must comply with Building Regulations (structural, thermal, safety glazing)
  • 4Check if the property has any Article 4 directions restricting window changes

Size and Dimension Limits

  • No specific PD size limits for individual windows
  • Structural lintel and support requirements apply based on wall type and opening size

When Permitted Development Does Not Apply

  • Listed buildings require listed building consent
  • Conservation areas may restrict new openings on visible elevations
  • Overlooking is the most common reason for neighbours to object
  • Creating large new openings in structural walls requires Building Regulations approval

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval is required covering structural support (lintels, padstones), thermal performance of the new window (Part L), safety glazing in critical locations (Part K), security requirements (Part Q, PAS 24), and ventilation (Part F). A structural engineer may be needed for large openings in load-bearing walls.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Derby building control or use an approved inspector.

How to Apply in Derby

If you need planning permission for your new window openings, you can apply through Derby's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Derby Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Derby. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Moderate risk if the new window overlooks a neighbouring property without being obscure glazed where required. The council can require the window to be altered or blocked up. This is a common source of neighbour disputes and enforcement complaints.

Frequently Asked Questions

Do I need planning permission for new window openings in Derby?
Adding new windows to existing walls is generally permitted under Part 1, Class A, provided the windows do not overlook neighbouring properties. Side-facing upper-floor windows must be obscure glazed and non-opening below 1.7m from the floor. New windows in the front elevation may change the building's appearance and could need PP in some areas. Note: Derby has 15 conservation areas (including Allestree, Arboretum, City Centre) where permitted development rights may be restricted. Check with Derby planning department.
Does new window openings in Derby need building regulations?
Yes. Building Regulations approval is required covering structural support (lintels, padstones), thermal performance of the new window (Part L), safety glazing in critical locations (Part K), security requirements (Part Q, PAS 24), and ventilation (Part F). A structural engineer may be needed for large openings in load-bearing walls. Contact Derby building control or an approved inspector for details.
How do I apply for planning permission in Derby?
You can apply for planning permission through Derby's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Derby?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Derby decided 88% of applications within the statutory or agreed time, and 42% of householder applications within 8 weeks.
What percentage of planning applications does Derby approve?
Derby granted 91% of the 937 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 91%.