Skip to content

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Depends on Your Specific SituationCity of London (London)

Do I Need Planning Permission for New Window Openings in City of London?

Creating new window openings in existing walls where none previously existed. This is generally permitted but side-facing windows at upper-floor level have specific restrictions to protect neighbours' privacy.

Planning in City of London

97%

of planning applications granted

80%

decided within the statutory or agreed time

In the four quarters to 2026 Q1, City of London decided 460 planning applications.

Planning statistics: MHCLG planning application statistics, the four quarters to 2026 Q1. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in City of London

City of London has 28 conservation areas. These include Bank, Barbican and Golden Lane, Bishopsgate, Bow Lane, Brewery, Chancery Lane. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

City of London has 1 recorded Article 4 direction. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact City of London planning department to check whether an Article 4 direction applies to your property.

Check with City of London planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for New Window Openings

Adding new windows to existing walls is generally permitted under Part 1, Class A, provided the windows do not overlook neighbouring properties. Side-facing upper-floor windows must be obscure glazed and non-opening below 1.7m from the floor. New windows in the front elevation may change the building's appearance and could need PP in some areas.

Conditions

  • 1Side-facing windows at upper-floor level must be obscure glazed and non-opening below 1.7m from the floor
  • 2New windows should not significantly alter the external appearance of the dwelling
  • 3Must comply with Building Regulations (structural, thermal, safety glazing)
  • 4Check if the property has any Article 4 directions restricting window changes

Size and Dimension Limits

  • No specific PD size limits for individual windows
  • Structural lintel and support requirements apply based on wall type and opening size

When Permitted Development Does Not Apply

  • Listed buildings require listed building consent
  • Conservation areas may restrict new openings on visible elevations
  • Overlooking is the most common reason for neighbours to object
  • Creating large new openings in structural walls requires Building Regulations approval

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval is required covering structural support (lintels, padstones), thermal performance of the new window (Part L), safety glazing in critical locations (Part K), security requirements (Part Q, PAS 24), and ventilation (Part F). A structural engineer may be needed for large openings in load-bearing walls.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact City of London building control or use an approved inspector.

How to Apply in City of London

If you need planning permission for your new window openings, you can apply through City of London's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit City of London Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from City of London. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Moderate risk if the new window overlooks a neighbouring property without being obscure glazed where required. The council can require the window to be altered or blocked up. This is a common source of neighbour disputes and enforcement complaints.

Frequently Asked Questions

Do I need planning permission for new window openings in City of London?
Adding new windows to existing walls is generally permitted under Part 1, Class A, provided the windows do not overlook neighbouring properties. Side-facing upper-floor windows must be obscure glazed and non-opening below 1.7m from the floor. New windows in the front elevation may change the building's appearance and could need PP in some areas. Note: City of London has 28 conservation areas (including Bank, Barbican and Golden Lane, Bishopsgate) and 1 recorded Article 4 direction where permitted development rights may be restricted. Check with City of London planning department.
Does new window openings in City of London need building regulations?
Yes. Building Regulations approval is required covering structural support (lintels, padstones), thermal performance of the new window (Part L), safety glazing in critical locations (Part K), security requirements (Part Q, PAS 24), and ventilation (Part F). A structural engineer may be needed for large openings in load-bearing walls. Contact City of London building control or an approved inspector for details.
How do I apply for planning permission in City of London?
You can apply for planning permission through City of London's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in City of London?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the four quarters to 2026 Q1, City of London decided 80% of applications within the statutory or agreed time.
What percentage of planning applications does City of London approve?
City of London granted 97% of the 460 planning applications it decided in the four quarters to 2026 Q1.

Find a Window Fitter in City of London

Browse local window fitters on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

New Window Openings rules in nearby council areas

Other projects in City of London

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co