Do I Need Planning Permission for a Hard Standing in Reading?

Creating a hard surface area on your property for parking, storage, or general use. The rules are the same as for driveway paving: permeable surfaces are PD, while non-permeable surfaces over 5 square metres need careful consideration.

Planning in Reading

84%

of planning applications granted

78%

decided within the statutory or agreed time

44%

of householder applications decided within 8 weeks

In the year to December 2025, Reading decided 635 planning applications. 285 of these were householder projects such as extensions, loft conversions and outbuildings, of which 91% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Reading

Reading has 15 conservation areas. These include Alexandra Road, Christchurch, Downshire Square, Eldon Square, Horncastle, Kendrick Road. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Reading has Article 4 directions in force. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Reading planning department to check whether an Article 4 direction applies to your property.

Check with Reading planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Hard Standing

Whether hard standing is PD depends on the surface type and location. Permeable surfaces (gravel, porous paving, permeable block paving) are PD under Part 1, Class F. Non-permeable surfaces over 5 square metres require planning permission unless they drain to a permeable area within the property boundary. Rear garden hard standing is generally PD.

Conditions

  • 1Permeable surfaces are PD regardless of size
  • 2Rear garden hard standing is generally PD
  • 3Front garden: non-permeable surfaces over 5 square metres require PP unless draining to a permeable area
  • 4Must not significantly raise the ground level (over 300mm becomes a raised platform)

Size and Dimension Limits

  • No size limit for permeable surfaces
  • Non-permeable front surfaces: 5 square metres maximum without drainage provision

When Permitted Development Does Not Apply

  • Front garden non-permeable surfaces over 5 square metres without proper drainage need PP
  • In designated areas, additional restrictions may apply
  • Consider the impact on drainage and flooding for neighbouring properties
  • A dropped kerb is a separate application if vehicular access is needed

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not apply to hard standing. Adequate drainage should be provided to prevent surface water flooding. This is enforced through the planning system and environmental regulations rather than Building Regulations.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Reading building control or use an approved inspector.

How to Apply in Reading

If you need planning permission for your hard standing, you can apply through Reading's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Reading Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Reading. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low to moderate risk depending on the surface type, size, and location. Non-permeable front garden surfaces are the main enforcement concern. The most common practical consequence is an issue raised during property sales rather than proactive council enforcement.

Frequently Asked Questions

Do I need planning permission for a hard standing in Reading?
Whether hard standing is PD depends on the surface type and location. Permeable surfaces (gravel, porous paving, permeable block paving) are PD under Part 1, Class F. Non-permeable surfaces over 5 square metres require planning permission unless they drain to a permeable area within the property boundary. Rear garden hard standing is generally PD. Note: Reading has 15 conservation areas (including Alexandra Road, Christchurch, Downshire Square) where permitted development rights may be restricted. Check with Reading planning department.
Does a hard standing in Reading need building regulations?
Building regulations approval is not usually required for a hard standing. Building Regulations do not apply to hard standing. Adequate drainage should be provided to prevent surface water flooding. This is enforced through the planning system and environmental regulations rather than Building Regulations.
How do I apply for planning permission in Reading?
You can apply for planning permission through Reading's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Reading?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Reading decided 78% of applications within the statutory or agreed time, and 44% of householder applications within 8 weeks.
What percentage of planning applications does Reading approve?
Reading granted 84% of the 635 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 91%.