Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Depends on Your Specific SituationEast Cambridgeshire (East of England)

Do I Need Planning Permission for a Hard Standing in East Cambridgeshire?

Creating a hard surface area on your property for parking, storage, or general use. The rules are the same as for driveway paving: permeable surfaces are PD, while non-permeable surfaces over 5 square metres need careful consideration.

Planning in East Cambridgeshire

87%

of planning applications granted

97%

decided within the statutory or agreed time

78%

of householder applications decided within 8 weeks

In the year to December 2025, East Cambridgeshire decided 725 planning applications. 384 of these were householder projects such as extensions, loft conversions and outbuildings, of which 90% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in East Cambridgeshire

East Cambridgeshire has 28 conservation areas. These include Ashley, Bottisham, Brinkley, Burrough Green, Burwell - High Town, Burwell - North Street. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

East Cambridgeshire has 3 recorded Article 4 directions. These include Millfield House, Mill Lane, Burwell; Russet Cottage, Mill Lane, Burwell; Willow Lodge, Mill Lane, Burwell. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact East Cambridgeshire planning department to check whether an Article 4 direction applies to your property.

Check with East Cambridgeshire planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Hard Standing

Whether hard standing is PD depends on the surface type and location. Permeable surfaces (gravel, porous paving, permeable block paving) are PD under Part 1, Class F. Non-permeable surfaces over 5 square metres require planning permission unless they drain to a permeable area within the property boundary. Rear garden hard standing is generally PD.

Conditions

  • 1Permeable surfaces are PD regardless of size
  • 2Rear garden hard standing is generally PD
  • 3Front garden: non-permeable surfaces over 5 square metres require PP unless draining to a permeable area
  • 4Must not significantly raise the ground level (over 300mm becomes a raised platform)

Size and Dimension Limits

  • No size limit for permeable surfaces
  • Non-permeable front surfaces: 5 square metres maximum without drainage provision

When Permitted Development Does Not Apply

  • Front garden non-permeable surfaces over 5 square metres without proper drainage need PP
  • In designated areas, additional restrictions may apply
  • Consider the impact on drainage and flooding for neighbouring properties
  • A dropped kerb is a separate application if vehicular access is needed

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not apply to hard standing. Adequate drainage should be provided to prevent surface water flooding. This is enforced through the planning system and environmental regulations rather than Building Regulations.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact East Cambridgeshire building control or use an approved inspector.

How to Apply in East Cambridgeshire

If you need planning permission for your hard standing, you can apply through East Cambridgeshire's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit East Cambridgeshire Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from East Cambridgeshire. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low to moderate risk depending on the surface type, size, and location. Non-permeable front garden surfaces are the main enforcement concern. The most common practical consequence is an issue raised during property sales rather than proactive council enforcement.

Frequently Asked Questions

Do I need planning permission for a hard standing in East Cambridgeshire?
Whether hard standing is PD depends on the surface type and location. Permeable surfaces (gravel, porous paving, permeable block paving) are PD under Part 1, Class F. Non-permeable surfaces over 5 square metres require planning permission unless they drain to a permeable area within the property boundary. Rear garden hard standing is generally PD. Note: East Cambridgeshire has 28 conservation areas (including Ashley, Bottisham, Brinkley) and 3 recorded Article 4 directions where permitted development rights may be restricted. Check with East Cambridgeshire planning department.
Does a hard standing in East Cambridgeshire need building regulations?
Building regulations approval is not usually required for a hard standing. Building Regulations do not apply to hard standing. Adequate drainage should be provided to prevent surface water flooding. This is enforced through the planning system and environmental regulations rather than Building Regulations.
How do I apply for planning permission in East Cambridgeshire?
You can apply for planning permission through East Cambridgeshire's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in East Cambridgeshire?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, East Cambridgeshire decided 97% of applications within the statutory or agreed time, and 78% of householder applications within 8 weeks.
What percentage of planning applications does East Cambridgeshire approve?
East Cambridgeshire granted 87% of the 725 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 90%.

Find a Builder in East Cambridgeshire

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Hard Standing rules in nearby council areas

Other projects in East Cambridgeshire