Usually Permitted DevelopmentHerefordshire (West Midlands)

Do I Need Planning Permission for a Ground Source Heat Pump in Herefordshire?

Installing a ground source heat pump (GSHP) that extracts heat from the ground via buried pipes (horizontal trenches or vertical boreholes). GSHPs have specific permitted development rights under Part 14.

Planning in Herefordshire

93%

of planning applications granted

75%

decided within the statutory or agreed time

46%

of householder applications decided within 8 weeks

In the four quarters to 2026 Q1, Herefordshire decided 1,406 planning applications. 524 of these were householder projects such as extensions, loft conversions and outbuildings, of which 95% were granted.

Planning statistics: MHCLG planning application statistics, the four quarters to 2026 Q1. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Herefordshire

Herefordshire has 64 conservation areas. These include Almeley, Aylestone Hill, Aylton, Bircher, Bodenham, Bodenham Road. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Herefordshire has Article 4 directions in force. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Herefordshire planning department to check whether an Article 4 direction applies to your property.

Check with Herefordshire planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Ground Source Heat Pump

Generally permitted under Part 14, Class H of the GPDO. Ground source heat pumps are PD when installed within the curtilage of a dwelling. The ground must be reinstated after installation.

Conditions

  • 1Must be installed within the curtilage of the dwelling
  • 2The land surface must be reinstated to its previous condition after installation
  • 3Must not be on land within the curtilage of a listed building
  • 4Equipment above ground (pumps, manifolds) must comply with standard outbuilding PD rules if in a separate enclosure

Size and Dimension Limits

  • No specific dimensions for the underground pipework
  • Above-ground equipment: follow outbuilding rules if housed in a separate structure

When Permitted Development Does Not Apply

  • Not PD within the curtilage of a listed building
  • Vertical boreholes may require an environmental permit from the Environment Agency depending on depth and local geology
  • Ground conditions must be suitable (assessed by an MCS-certified installer)
  • The ground must be reinstated afterwards

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply to the heating system installation. Covers Part L (energy efficiency), Part P (electrical), and the integration with the existing heating system. An MCS-certified installer can self-certify the work. MCS certification is required to qualify for the Boiler Upgrade Scheme grant.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Herefordshire building control or use an approved inspector.

How to Apply in Herefordshire

If you need planning permission for your ground source heat pump, you can apply through Herefordshire's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Herefordshire Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Herefordshire. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low planning enforcement risk as the installation is almost entirely underground and invisible once complete. The main regulatory risks are environmental (contamination of groundwater) rather than planning.

Frequently Asked Questions

Do I need planning permission for a ground source heat pump in Herefordshire?
Generally permitted under Part 14, Class H of the GPDO. Ground source heat pumps are PD when installed within the curtilage of a dwelling. The ground must be reinstated after installation. Note: Herefordshire has 64 conservation areas (including Almeley, Aylestone Hill, Aylton) where permitted development rights may be restricted. Check with Herefordshire planning department.
Does a ground source heat pump in Herefordshire need building regulations?
Yes. Building Regulations apply to the heating system installation. Covers Part L (energy efficiency), Part P (electrical), and the integration with the existing heating system. An MCS-certified installer can self-certify the work. MCS certification is required to qualify for the Boiler Upgrade Scheme grant. Contact Herefordshire building control or an approved inspector for details.
How do I apply for planning permission in Herefordshire?
You can apply for planning permission through Herefordshire's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Herefordshire?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the four quarters to 2026 Q1, Herefordshire decided 75% of applications within the statutory or agreed time, and 46% of householder applications within 8 weeks.
What percentage of planning applications does Herefordshire approve?
Herefordshire granted 93% of the 1,406 planning applications it decided in the four quarters to 2026 Q1. For householder applications such as extensions and outbuildings, the approval rate was 95%.

Find a Heat Pump Installer in Herefordshire

Browse local heat pump installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Ground Source Heat Pump rules in nearby council areas

Other projects in Herefordshire

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co