Usually Permitted DevelopmentExmoor National Park (South West)

Do I Need Planning Permission for a Ground Source Heat Pump in Exmoor National Park?

Installing a ground source heat pump (GSHP) that extracts heat from the ground via buried pipes (horizontal trenches or vertical boreholes). GSHPs have specific permitted development rights under Part 14.

Planning in Exmoor National Park

96%

of planning applications granted

98%

decided within the statutory or agreed time

47%

of householder applications decided within 8 weeks

In the four quarters to 2026 Q1, Exmoor National Park decided 174 planning applications. 55 of these were householder projects such as extensions, loft conversions and outbuildings, of which 98% were granted.

Planning statistics: MHCLG planning application statistics, the four quarters to 2026 Q1. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Exmoor National Park

Exmoor National Park has 17 conservation areas. These include Allerford, Bossington and West Lynch, Colton Farm, Dulverton, Dunster, Leigh Barton. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Exmoor National Park planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Ground Source Heat Pump

Generally permitted under Part 14, Class H of the GPDO. Ground source heat pumps are PD when installed within the curtilage of a dwelling. The ground must be reinstated after installation.

Conditions

  • 1Must be installed within the curtilage of the dwelling
  • 2The land surface must be reinstated to its previous condition after installation
  • 3Must not be on land within the curtilage of a listed building
  • 4Equipment above ground (pumps, manifolds) must comply with standard outbuilding PD rules if in a separate enclosure

Size and Dimension Limits

  • No specific dimensions for the underground pipework
  • Above-ground equipment: follow outbuilding rules if housed in a separate structure

When Permitted Development Does Not Apply

  • Not PD within the curtilage of a listed building
  • Vertical boreholes may require an environmental permit from the Environment Agency depending on depth and local geology
  • Ground conditions must be suitable (assessed by an MCS-certified installer)
  • The ground must be reinstated afterwards

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply to the heating system installation. Covers Part L (energy efficiency), Part P (electrical), and the integration with the existing heating system. An MCS-certified installer can self-certify the work. MCS certification is required to qualify for the Boiler Upgrade Scheme grant.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Exmoor National Park building control or use an approved inspector.

How to Apply in Exmoor National Park

If you need planning permission for your ground source heat pump, you can apply through Exmoor National Park's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Exmoor National Park Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Exmoor National Park. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low planning enforcement risk as the installation is almost entirely underground and invisible once complete. The main regulatory risks are environmental (contamination of groundwater) rather than planning.

Frequently Asked Questions

Do I need planning permission for a ground source heat pump in Exmoor National Park?
Generally permitted under Part 14, Class H of the GPDO. Ground source heat pumps are PD when installed within the curtilage of a dwelling. The ground must be reinstated after installation. Note: Exmoor National Park has 17 conservation areas (including Allerford, Bossington and West Lynch, Colton Farm) where permitted development rights may be restricted. Check with Exmoor National Park planning department.
Does a ground source heat pump in Exmoor National Park need building regulations?
Yes. Building Regulations apply to the heating system installation. Covers Part L (energy efficiency), Part P (electrical), and the integration with the existing heating system. An MCS-certified installer can self-certify the work. MCS certification is required to qualify for the Boiler Upgrade Scheme grant. Contact Exmoor National Park building control or an approved inspector for details.
How do I apply for planning permission in Exmoor National Park?
You can apply for planning permission through Exmoor National Park's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Exmoor National Park?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the four quarters to 2026 Q1, Exmoor National Park decided 98% of applications within the statutory or agreed time, and 47% of householder applications within 8 weeks.
What percentage of planning applications does Exmoor National Park approve?
Exmoor National Park granted 96% of the 174 planning applications it decided in the four quarters to 2026 Q1. For householder applications such as extensions and outbuildings, the approval rate was 98%.

Find a Heat Pump Installer in Exmoor National Park

Browse local heat pump installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Ground Source Heat Pump rules in nearby council areas

Other projects in Exmoor National Park

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co