Do I Need Planning Permission for a Ground Source Heat Pump in East Hampshire?

Installing a ground source heat pump (GSHP) that extracts heat from the ground via buried pipes (horizontal trenches or vertical boreholes). GSHPs have specific permitted development rights under Part 14.

Planning in East Hampshire

88%

of planning applications granted

67%

decided within the statutory or agreed time

24%

of householder applications decided within 8 weeks

In the four quarters to 2026 Q1, East Hampshire decided 606 planning applications. 327 of these were householder projects such as extensions, loft conversions and outbuildings, of which 91% were granted.

Planning statistics: MHCLG planning application statistics, the four quarters to 2026 Q1. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in East Hampshire

East Hampshire has 45 conservation areas. These include Alton, Bentley, Blackmoor, Blendworth, Brockhampton, Catherington. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

East Hampshire has 101 recorded Article 4 directions. These include Ajax House/Plowden House, Liphook; Bedford Road, Petersfield; Bellhanger Enterprises, Bentworth; Bentley Business Park, Bentley. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact East Hampshire planning department to check whether an Article 4 direction applies to your property.

Check with East Hampshire planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Ground Source Heat Pump

Generally permitted under Part 14, Class H of the GPDO. Ground source heat pumps are PD when installed within the curtilage of a dwelling. The ground must be reinstated after installation.

Conditions

  • 1Must be installed within the curtilage of the dwelling
  • 2The land surface must be reinstated to its previous condition after installation
  • 3Must not be on land within the curtilage of a listed building
  • 4Equipment above ground (pumps, manifolds) must comply with standard outbuilding PD rules if in a separate enclosure

Size and Dimension Limits

  • No specific dimensions for the underground pipework
  • Above-ground equipment: follow outbuilding rules if housed in a separate structure

When Permitted Development Does Not Apply

  • Not PD within the curtilage of a listed building
  • Vertical boreholes may require an environmental permit from the Environment Agency depending on depth and local geology
  • Ground conditions must be suitable (assessed by an MCS-certified installer)
  • The ground must be reinstated afterwards

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply to the heating system installation. Covers Part L (energy efficiency), Part P (electrical), and the integration with the existing heating system. An MCS-certified installer can self-certify the work. MCS certification is required to qualify for the Boiler Upgrade Scheme grant.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact East Hampshire building control or use an approved inspector.

How to Apply in East Hampshire

If you need planning permission for your ground source heat pump, you can apply through East Hampshire's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit East Hampshire Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from East Hampshire. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low planning enforcement risk as the installation is almost entirely underground and invisible once complete. The main regulatory risks are environmental (contamination of groundwater) rather than planning.

Frequently Asked Questions

Do I need planning permission for a ground source heat pump in East Hampshire?
Generally permitted under Part 14, Class H of the GPDO. Ground source heat pumps are PD when installed within the curtilage of a dwelling. The ground must be reinstated after installation. Note: East Hampshire has 45 conservation areas (including Alton, Bentley, Blackmoor) and 101 recorded Article 4 directions where permitted development rights may be restricted. Check with East Hampshire planning department.
Does a ground source heat pump in East Hampshire need building regulations?
Yes. Building Regulations apply to the heating system installation. Covers Part L (energy efficiency), Part P (electrical), and the integration with the existing heating system. An MCS-certified installer can self-certify the work. MCS certification is required to qualify for the Boiler Upgrade Scheme grant. Contact East Hampshire building control or an approved inspector for details.
How do I apply for planning permission in East Hampshire?
You can apply for planning permission through East Hampshire's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in East Hampshire?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the four quarters to 2026 Q1, East Hampshire decided 67% of applications within the statutory or agreed time, and 24% of householder applications within 8 weeks.
What percentage of planning applications does East Hampshire approve?
East Hampshire granted 88% of the 606 planning applications it decided in the four quarters to 2026 Q1. For householder applications such as extensions and outbuildings, the approval rate was 91%.

Find a Heat Pump Installer in East Hampshire

Browse local heat pump installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Ground Source Heat Pump rules in nearby council areas

Other projects in East Hampshire

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co