Do I Need Planning Permission for a Ground Source Heat Pump in Blackburn with Darwen?

Installing a ground source heat pump (GSHP) that extracts heat from the ground via buried pipes (horizontal trenches or vertical boreholes). GSHPs have specific permitted development rights under Part 14.

Planning in Blackburn with Darwen

96%

of planning applications granted

100%

decided within the statutory or agreed time

73%

of householder applications decided within 8 weeks

In the four quarters to 2026 Q1, Blackburn with Darwen decided 519 planning applications. 274 of these were householder projects such as extensions, loft conversions and outbuildings, of which 98% were granted.

Planning statistics: MHCLG planning application statistics, the four quarters to 2026 Q1. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Blackburn with Darwen

Blackburn with Darwen has 14 conservation areas. These include Cathedral, Chapeltown, Corporation Park, Darwen Street, Darwen Town Centre, Eanam Wharf. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Blackburn with Darwen planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Ground Source Heat Pump

Generally permitted under Part 14, Class H of the GPDO. Ground source heat pumps are PD when installed within the curtilage of a dwelling. The ground must be reinstated after installation.

Conditions

  • 1Must be installed within the curtilage of the dwelling
  • 2The land surface must be reinstated to its previous condition after installation
  • 3Must not be on land within the curtilage of a listed building
  • 4Equipment above ground (pumps, manifolds) must comply with standard outbuilding PD rules if in a separate enclosure

Size and Dimension Limits

  • No specific dimensions for the underground pipework
  • Above-ground equipment: follow outbuilding rules if housed in a separate structure

When Permitted Development Does Not Apply

  • Not PD within the curtilage of a listed building
  • Vertical boreholes may require an environmental permit from the Environment Agency depending on depth and local geology
  • Ground conditions must be suitable (assessed by an MCS-certified installer)
  • The ground must be reinstated afterwards

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply to the heating system installation. Covers Part L (energy efficiency), Part P (electrical), and the integration with the existing heating system. An MCS-certified installer can self-certify the work. MCS certification is required to qualify for the Boiler Upgrade Scheme grant.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Blackburn with Darwen building control or use an approved inspector.

How to Apply in Blackburn with Darwen

If you need planning permission for your ground source heat pump, you can apply through Blackburn with Darwen's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Blackburn with Darwen Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Blackburn with Darwen. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low planning enforcement risk as the installation is almost entirely underground and invisible once complete. The main regulatory risks are environmental (contamination of groundwater) rather than planning.

Frequently Asked Questions

Do I need planning permission for a ground source heat pump in Blackburn with Darwen?
Generally permitted under Part 14, Class H of the GPDO. Ground source heat pumps are PD when installed within the curtilage of a dwelling. The ground must be reinstated after installation. Note: Blackburn with Darwen has 14 conservation areas (including Cathedral, Chapeltown, Corporation Park) where permitted development rights may be restricted. Check with Blackburn with Darwen planning department.
Does a ground source heat pump in Blackburn with Darwen need building regulations?
Yes. Building Regulations apply to the heating system installation. Covers Part L (energy efficiency), Part P (electrical), and the integration with the existing heating system. An MCS-certified installer can self-certify the work. MCS certification is required to qualify for the Boiler Upgrade Scheme grant. Contact Blackburn with Darwen building control or an approved inspector for details.
How do I apply for planning permission in Blackburn with Darwen?
You can apply for planning permission through Blackburn with Darwen's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Blackburn with Darwen?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the four quarters to 2026 Q1, Blackburn with Darwen decided 100% of applications within the statutory or agreed time, and 73% of householder applications within 8 weeks.
What percentage of planning applications does Blackburn with Darwen approve?
Blackburn with Darwen granted 96% of the 519 planning applications it decided in the four quarters to 2026 Q1. For householder applications such as extensions and outbuildings, the approval rate was 98%.

Find a Heat Pump Installer in Blackburn with Darwen

Browse local heat pump installers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Ground Source Heat Pump rules in nearby council areas

Other projects in Blackburn with Darwen

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co