Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentCity of London (London)

Do I Need Planning Permission for a Greenhouse in City of London?

A glazed garden structure for growing plants. Greenhouses follow the same permitted development rules as other garden outbuildings.

Planning in City of London

96%

of planning applications granted

84%

decided within the statutory or agreed time

In the year to December 2025, City of London decided 448 planning applications.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in City of London

City of London has 28 conservation areas. These include Bank, Barbican and Golden Lane, Bishopsgate, Bow Lane, Brewery, Chancery Lane. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

City of London has 1 recorded Article 4 direction. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact City of London planning department to check whether an Article 4 direction applies to your property.

Check with City of London planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Greenhouse

Generally permitted under Part 1, Class E as an outbuilding for purposes incidental to the enjoyment of the dwelling. The same height and area rules apply as for sheds and other outbuildings.

Conditions

  • 1Must be for purposes incidental to the enjoyment of the dwelling
  • 2Must not be forward of the principal elevation
  • 3Same height limits as outbuildings (2.5m within 2m of boundary; 4m/3m elsewhere)
  • 4Must not cover more than half the curtilage

Size and Dimension Limits

  • Height within 2m of boundary: 2.5m maximum
  • Height elsewhere: 4m (dual pitch) or 3m (other roofs)
  • Total outbuilding area must not exceed 50% of curtilage

When Permitted Development Does Not Apply

  • Designated area restrictions apply
  • Must not be used for commercial growing or retail
  • Large greenhouses may attract neighbour complaints about overshadowing or visual impact

What About Building Regulations?

Building regulations approval is not usually required

Greenhouses are normally exempt from Building Regulations as single-storey outbuildings under 30 square metres with no sleeping accommodation. Any electrical installation must comply with Part P.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact City of London building control or use an approved inspector.

How to Apply in City of London

If you need planning permission for your greenhouse, you can apply through City of London's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit City of London Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from City of London. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low risk for domestic greenhouses within PD limits. Enforcement is rare unless the greenhouse is unusually large or used for commercial purposes.

Frequently Asked Questions

Do I need planning permission for a greenhouse in City of London?
Generally permitted under Part 1, Class E as an outbuilding for purposes incidental to the enjoyment of the dwelling. The same height and area rules apply as for sheds and other outbuildings. Note: City of London has 28 conservation areas (including Bank, Barbican and Golden Lane, Bishopsgate) and 1 recorded Article 4 direction where permitted development rights may be restricted. Check with City of London planning department.
Does a greenhouse in City of London need building regulations?
Building regulations approval is not usually required for a greenhouse. Greenhouses are normally exempt from Building Regulations as single-storey outbuildings under 30 square metres with no sleeping accommodation. Any electrical installation must comply with Part P.
How do I apply for planning permission in City of London?
You can apply for planning permission through City of London's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in City of London?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, City of London decided 84% of applications within the statutory or agreed time.
What percentage of planning applications does City of London approve?
City of London granted 96% of the 448 planning applications it decided in the year to December 2025.

Find a Builder in City of London

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Greenhouse rules in nearby council areas

Other projects in City of London