Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentCroydon (London)

Do I Need Planning Permission for a Garden Shed in Croydon?

A garden shed for storage, hobbies, or as a workshop. Garden sheds are one of the most straightforward projects under permitted development, provided they stay within the size and height limits.

Planning in Croydon

75%

of planning applications granted

92%

decided within the statutory or agreed time

64%

of householder applications decided within 8 weeks

In the year to December 2025, Croydon decided 1,582 planning applications. 812 of these were householder projects such as extensions, loft conversions and outbuildings, of which 87% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Croydon

Croydon has 19 conservation areas. These include Addington Village, Beulah Hill, Bradmore Green, Central Croydon, Chapman Houses, Croham Manor Road, Chatsworth Road. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Croydon planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Garden Shed

Generally permitted under Part 1, Class E of the GPDO. Outbuildings are permitted provided they are for purposes incidental to the enjoyment of the dwelling, are not forward of the principal elevation, and comply with height and area limits.

Conditions

  • 1Must be for purposes incidental to the enjoyment of the dwelling
  • 2Must not be forward of the principal elevation fronting a highway
  • 3Maximum height 2.5m if within 2m of a boundary
  • 4Maximum height 4m (dual-pitch roof) or 3m (any other roof) if more than 2m from a boundary
  • 5Must not cover more than half the curtilage (combined with all other outbuildings and extensions)

Size and Dimension Limits

  • Height within 2m of boundary: 2.5m maximum
  • Height elsewhere: 4m (dual pitch) or 3m (other roofs)
  • No single building footprint limit, but total must not exceed 50% of curtilage

When Permitted Development Does Not Apply

  • In designated areas (conservation areas, AONB, etc.), outbuildings to the side of the house are not permitted development
  • In designated areas, total outbuilding area beyond 10 square metres requires planning permission
  • Cannot be used for sleeping accommodation (residential use)
  • Must not be a separate self-contained dwelling

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not normally apply to detached single-storey outbuildings under 15 square metres with no sleeping accommodation. Between 15 and 30 square metres, the building must be at least 1m from any boundary or be constructed of non-combustible materials. Over 30 square metres, Building Regulations apply.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Croydon building control or use an approved inspector.

How to Apply in Croydon

If you need planning permission for your garden shed, you can apply through Croydon's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Croydon Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Croydon. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Enforcement is unlikely for modest sheds within PD limits. Oversized or over-height sheds may attract complaints from neighbours, leading to enforcement investigation. The council can require removal if the shed breaches PD conditions.

Frequently Asked Questions

Do I need planning permission for a garden shed in Croydon?
Generally permitted under Part 1, Class E of the GPDO. Outbuildings are permitted provided they are for purposes incidental to the enjoyment of the dwelling, are not forward of the principal elevation, and comply with height and area limits. Note: Croydon has 19 conservation areas (including Addington Village, Beulah Hill, Bradmore Green) where permitted development rights may be restricted. Check with Croydon planning department.
Does a garden shed in Croydon need building regulations?
Building regulations approval is not usually required for a garden shed. Building Regulations do not normally apply to detached single-storey outbuildings under 15 square metres with no sleeping accommodation. Between 15 and 30 square metres, the building must be at least 1m from any boundary or be constructed of non-combustible materials. Over 30 square metres, Building Regulations apply.
How do I apply for planning permission in Croydon?
You can apply for planning permission through Croydon's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Croydon?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Croydon decided 92% of applications within the statutory or agreed time, and 64% of householder applications within 8 weeks.
What percentage of planning applications does Croydon approve?
Croydon granted 75% of the 1,582 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 87%.

Find a Carpenter in Croydon

Browse local carpenters on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Garden Shed rules in nearby council areas

Other projects in Croydon