Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentBlackpool (North West)

Do I Need Planning Permission for a Garden Shed in Blackpool?

A garden shed for storage, hobbies, or as a workshop. Garden sheds are one of the most straightforward projects under permitted development, provided they stay within the size and height limits.

Planning in Blackpool

82%

of planning applications granted

90%

decided within the statutory or agreed time

74%

of householder applications decided within 8 weeks

In the year to December 2025, Blackpool decided 349 planning applications. 129 of these were householder projects such as extensions, loft conversions and outbuildings, of which 76% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Blackpool

Blackpool has 7 conservation areas. These include Foxhall, Layton, Marton Moss, North Promenade, Raikes Hall, Stanley Park. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Blackpool has Article 4 directions in force. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Blackpool planning department to check whether an Article 4 direction applies to your property.

Check with Blackpool planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Garden Shed

Generally permitted under Part 1, Class E of the GPDO. Outbuildings are permitted provided they are for purposes incidental to the enjoyment of the dwelling, are not forward of the principal elevation, and comply with height and area limits.

Conditions

  • 1Must be for purposes incidental to the enjoyment of the dwelling
  • 2Must not be forward of the principal elevation fronting a highway
  • 3Maximum height 2.5m if within 2m of a boundary
  • 4Maximum height 4m (dual-pitch roof) or 3m (any other roof) if more than 2m from a boundary
  • 5Must not cover more than half the curtilage (combined with all other outbuildings and extensions)

Size and Dimension Limits

  • Height within 2m of boundary: 2.5m maximum
  • Height elsewhere: 4m (dual pitch) or 3m (other roofs)
  • No single building footprint limit, but total must not exceed 50% of curtilage

When Permitted Development Does Not Apply

  • In designated areas (conservation areas, AONB, etc.), outbuildings to the side of the house are not permitted development
  • In designated areas, total outbuilding area beyond 10 square metres requires planning permission
  • Cannot be used for sleeping accommodation (residential use)
  • Must not be a separate self-contained dwelling

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not normally apply to detached single-storey outbuildings under 15 square metres with no sleeping accommodation. Between 15 and 30 square metres, the building must be at least 1m from any boundary or be constructed of non-combustible materials. Over 30 square metres, Building Regulations apply.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Blackpool building control or use an approved inspector.

How to Apply in Blackpool

If you need planning permission for your garden shed, you can apply through Blackpool's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Blackpool Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Blackpool. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Enforcement is unlikely for modest sheds within PD limits. Oversized or over-height sheds may attract complaints from neighbours, leading to enforcement investigation. The council can require removal if the shed breaches PD conditions.

Frequently Asked Questions

Do I need planning permission for a garden shed in Blackpool?
Generally permitted under Part 1, Class E of the GPDO. Outbuildings are permitted provided they are for purposes incidental to the enjoyment of the dwelling, are not forward of the principal elevation, and comply with height and area limits. Note: Blackpool has 7 conservation areas (including Foxhall, Layton, Marton Moss) and Article 4 directions in force where permitted development rights may be restricted. Check with Blackpool planning department.
Does a garden shed in Blackpool need building regulations?
Building regulations approval is not usually required for a garden shed. Building Regulations do not normally apply to detached single-storey outbuildings under 15 square metres with no sleeping accommodation. Between 15 and 30 square metres, the building must be at least 1m from any boundary or be constructed of non-combustible materials. Over 30 square metres, Building Regulations apply.
How do I apply for planning permission in Blackpool?
You can apply for planning permission through Blackpool's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Blackpool?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Blackpool decided 90% of applications within the statutory or agreed time, and 74% of householder applications within 8 weeks.
What percentage of planning applications does Blackpool approve?
Blackpool granted 82% of the 349 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 76%.

Find a Carpenter in Blackpool

Browse local carpenters on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Garden Shed rules in nearby council areas

Other projects in Blackpool