This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentTandridge (South East)

Do I Need Planning Permission for a Garden Room in Tandridge?

A fully insulated, habitable garden building used as a living room, hobby space, or entertainment area. Garden rooms are treated as outbuildings for PD purposes but must be used for purposes incidental to the main dwelling.

Planning in Tandridge

85%

of planning applications granted

92%

decided within the statutory or agreed time

56%

of householder applications decided within 8 weeks

In the year to December 2025, Tandridge decided 709 planning applications. 424 of these were householder projects such as extensions, loft conversions and outbuildings, of which 89% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Tandridge

Tandridge has 19 conservation areas. These include Bletchingley, Broadham Green and Spring Lane, Burstow, Caterham Barracks, Chaldon, Fickleshole. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Tandridge has 45 recorded Article 4 directions. These include Fortunon Farm, Godstone Hill, Godstone.; Land Adj. Tenchleys Farm, Tenchleys Lane, Limpsfield.; Land At Burstow Lodge Farm, Normans Corner, Smallfield.; Land At Dairy House Farm, Green Lane, Outwood.. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Tandridge planning department to check whether an Article 4 direction applies to your property.

Check with Tandridge planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Garden Room

Generally permitted under Part 1, Class E as an outbuilding. Garden rooms follow the same rules as other outbuildings. The key requirement is that the use must be incidental to the enjoyment of the main dwelling.

Conditions

  • 1Must be for purposes incidental to the enjoyment of the dwelling
  • 2Must not be forward of the principal elevation
  • 3Same height limits as outbuildings (2.5m within 2m of boundary; 4m/3m elsewhere)
  • 4Must not cover more than half the curtilage
  • 5Must not be used as sleeping accommodation or a separate dwelling

Size and Dimension Limits

  • Height within 2m of boundary: 2.5m maximum
  • Height elsewhere: 4m (dual pitch) or 3m (other roofs)
  • Total outbuilding area must not exceed 50% of curtilage

When Permitted Development Does Not Apply

  • Using a garden room as a bedroom, flat, or rental property requires planning permission (change of use)
  • Designated area restrictions apply
  • Full plumbing (kitchen, bathroom) may suggest non-incidental use
  • Insulation, heating, and utilities do not by themselves change PD status

What About Building Regulations?

Building regulations approval is not usually required

Under 15 square metres with no sleeping accommodation: normally exempt. Between 15 and 30 square metres: must be 1m from any boundary or non-combustible construction. Over 30 square metres: Building Regulations apply. Electrical installations must comply with Part P regardless of size.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Tandridge building control or use an approved inspector.

How to Apply in Tandridge

If you need planning permission for your garden room, you can apply through Tandridge's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Tandridge Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Tandridge. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Moderate risk if used as a separate dwelling or sleeping accommodation. The council can take enforcement action against unauthorised residential use, regardless of whether the building itself was built under PD rights.

Frequently Asked Questions

Do I need planning permission for a garden room in Tandridge?
Generally permitted under Part 1, Class E as an outbuilding. Garden rooms follow the same rules as other outbuildings. The key requirement is that the use must be incidental to the enjoyment of the main dwelling. Note: Tandridge has 19 conservation areas (including Bletchingley, Broadham Green and Spring Lane, Burstow) and 45 recorded Article 4 directions where permitted development rights may be restricted. Check with Tandridge planning department.
Does a garden room in Tandridge need building regulations?
Building regulations approval is not usually required for a garden room. Under 15 square metres with no sleeping accommodation: normally exempt. Between 15 and 30 square metres: must be 1m from any boundary or non-combustible construction. Over 30 square metres: Building Regulations apply. Electrical installations must comply with Part P regardless of size.
How do I apply for planning permission in Tandridge?
You can apply for planning permission through Tandridge's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Tandridge?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Tandridge decided 92% of applications within the statutory or agreed time, and 56% of householder applications within 8 weeks.
What percentage of planning applications does Tandridge approve?
Tandridge granted 85% of the 709 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 89%.