Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentAdur (South East)

Do I Need Planning Permission for a Garden Office in Adur?

A dedicated workspace in your garden, increasingly popular since the shift to home working. Garden offices follow outbuilding PD rules but the use must remain incidental to the main dwelling.

Planning in Adur

92%

of planning applications granted

93%

decided within the statutory or agreed time

59%

of householder applications decided within 8 weeks

In the year to December 2025, Adur decided 310 planning applications. 213 of these were householder projects such as extensions, loft conversions and outbuildings, of which 95% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Adur

Adur has 7 conservation areas. These include Kingston Buci, North Lancing, Old Shoreham, Shoreham-by-Sea, Sompting, Southlands. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Adur has 9 recorded Article 4 directions. These include Church Street, Shoreham-by-Sea; Kingston Buci Conservation Area; Land adjoining Steyning Road, Shoreham-by-Sea; Land at Southwick Old Rectory, Kingston Lane, Southwick. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Adur planning department to check whether an Article 4 direction applies to your property.

Check with Adur planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Garden Office

Generally permitted under Part 1, Class E as an outbuilding for purposes incidental to the enjoyment of the dwelling. Working from home in a garden office is usually considered incidental, but running a business with visiting clients or employees may cross into a change of use.

Conditions

  • 1Must be for purposes incidental to the enjoyment of the dwelling
  • 2Working from home (no visiting clients, no employees) is generally incidental
  • 3Must not be forward of the principal elevation
  • 4Same height and area limits as other outbuildings
  • 5Must not contain sleeping accommodation

Size and Dimension Limits

  • Height within 2m of boundary: 2.5m maximum
  • Height elsewhere: 4m (dual pitch) or 3m (other roofs)
  • Total outbuilding area must not exceed 50% of curtilage

When Permitted Development Does Not Apply

  • If clients or employees regularly visit, this may constitute a material change of use requiring PP
  • Business rates may apply if the office is assessed as commercial premises
  • Designated area restrictions apply
  • Noise, parking, or traffic generation from business use could trigger enforcement

What About Building Regulations?

Building regulations approval is not usually required

A garden office under 15 square metres with no sleeping accommodation is normally exempt from Building Regulations. Larger offices may require approval. Electrical installations must comply with Part P (either through a registered installer or building control notification). Consider thermal insulation for year-round comfort.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Adur building control or use an approved inspector.

How to Apply in Adur

If you need planning permission for your garden office, you can apply through Adur's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Adur Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Adur. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk if used solely by the homeowner for remote working. Using a garden office as a separate commercial premises with visiting clients, employees, or deliveries can attract enforcement for change of use. Business rates liability may also arise.

Frequently Asked Questions

Do I need planning permission for a garden office in Adur?
Generally permitted under Part 1, Class E as an outbuilding for purposes incidental to the enjoyment of the dwelling. Working from home in a garden office is usually considered incidental, but running a business with visiting clients or employees may cross into a change of use. Note: Adur has 7 conservation areas (including Kingston Buci, North Lancing, Old Shoreham) and 9 recorded Article 4 directions where permitted development rights may be restricted. Check with Adur planning department.
Does a garden office in Adur need building regulations?
Building regulations approval is not usually required for a garden office. A garden office under 15 square metres with no sleeping accommodation is normally exempt from Building Regulations. Larger offices may require approval. Electrical installations must comply with Part P (either through a registered installer or building control notification). Consider thermal insulation for year-round comfort.
How do I apply for planning permission in Adur?
You can apply for planning permission through Adur's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Adur?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Adur decided 93% of applications within the statutory or agreed time, and 59% of householder applications within 8 weeks.
What percentage of planning applications does Adur approve?
Adur granted 92% of the 310 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 95%.

Find a Builder in Adur

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Garden Office rules in nearby council areas

Other projects in Adur