Skip to content

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Depends on Your Specific SituationBromley (London)

Do I Need Planning Permission for a Driveway Paving in Bromley?

Paving or resurfacing a front driveway. Since 2008, non-permeable driveway surfaces over 5 square metres require planning permission unless they drain to a permeable area within the curtilage.

Planning in Bromley

77%

of planning applications granted

86%

decided within the statutory or agreed time

66%

of householder applications decided within 8 weeks

In the four quarters to 2026 Q1, Bromley decided 2,164 planning applications. 1,538 of these were householder projects such as extensions, loft conversions and outbuildings, of which 79% were granted.

Planning statistics: MHCLG planning application statistics, the four quarters to 2026 Q1. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Bromley

Bromley has 43 conservation areas. These include Aldersmead Road, Beckenham, Alexandra Cottages (Parish Lane), Barnmead Road, Beckenham, Beckenham Place Park, Belvedere Road, Anerley, Bickley Park. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Bromley has 108 recorded Article 4 directions. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Bromley planning department to check whether an Article 4 direction applies to your property.

Check with Bromley planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Driveway Paving

Permitted development under Part 1, Class F if the surface is permeable (allows water to soak through) or the surface drains to a permeable area within the curtilage of the dwelling. Non-permeable surfaces over 5 square metres that do not drain to a permeable area require planning permission.

Conditions

  • 1Permeable surfaces (porous paving, gravel, permeable block paving) are PD
  • 2Non-permeable surfaces are PD only if the area is under 5 square metres
  • 3Non-permeable surfaces over 5 square metres are PD if rainwater drains to a permeable area within the property boundary
  • 4A dropped kerb may be needed for vehicular access (separate highway application)

Size and Dimension Limits

  • No maximum size for permeable driveways
  • Non-permeable surfaces: 5 square metres maximum without drainage to a permeable area

When Permitted Development Does Not Apply

  • Listed buildings may require consent
  • Conservation areas may have additional requirements
  • Dropped kerb applications are separate from planning and go through the highway authority
  • SUDs (sustainable urban drainage) best practice should be followed

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not apply to driveway paving. The key requirement is adequate drainage to prevent surface water flooding, as enforced through the planning system rather than Building Regulations.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Bromley building control or use an approved inspector.

How to Apply in Bromley

If you need planning permission for your driveway paving, you can apply through Bromley's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Bromley Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Bromley. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Moderate enforcement risk for non-permeable driveways over 5 square metres without proper drainage. This rule was introduced to reduce surface water flooding, and councils do enforce it. However, the most common practical consequence is an issue raised during property sales rather than proactive enforcement.

Frequently Asked Questions

Do I need planning permission for a driveway paving in Bromley?
Permitted development under Part 1, Class F if the surface is permeable (allows water to soak through) or the surface drains to a permeable area within the curtilage of the dwelling. Non-permeable surfaces over 5 square metres that do not drain to a permeable area require planning permission. Note: Bromley has 43 conservation areas (including Aldersmead Road, Beckenham, Alexandra Cottages (Parish Lane), Barnmead Road, Beckenham) and 108 recorded Article 4 directions where permitted development rights may be restricted. Check with Bromley planning department.
Does a driveway paving in Bromley need building regulations?
Building regulations approval is not usually required for a driveway paving. Building Regulations do not apply to driveway paving. The key requirement is adequate drainage to prevent surface water flooding, as enforced through the planning system rather than Building Regulations.
How do I apply for planning permission in Bromley?
You can apply for planning permission through Bromley's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Bromley?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the four quarters to 2026 Q1, Bromley decided 86% of applications within the statutory or agreed time, and 66% of householder applications within 8 weeks.
What percentage of planning applications does Bromley approve?
Bromley granted 77% of the 2,164 planning applications it decided in the four quarters to 2026 Q1. For householder applications such as extensions and outbuildings, the approval rate was 79%.

Find a Driveway Specialist in Bromley

Browse local driveway specialists on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Driveway Paving rules in nearby council areas

Other projects in Bromley

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co