Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentLambeth (London)

Do I Need Planning Permission for a Conservatory in Lambeth?

A glazed extension, typically to the rear of the property, used as a living or dining space. Conservatories follow the same permitted development rules as single-storey extensions but may be exempt from Building Regulations if they meet certain conditions.

Planning in Lambeth

80%

of planning applications granted

95%

decided within the statutory or agreed time

61%

of householder applications decided within 8 weeks

In the year to December 2025, Lambeth decided 1,725 planning applications. 604 of these were householder projects such as extensions, loft conversions and outbuildings, of which 83% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Lambeth

Lambeth has 64 conservation areas. These include Abbeville Road, Albert Embankment, Albert Square, Brixton, Brixton Road, Brixton Water Lane. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Lambeth has 12 recorded Article 4 directions. These include Albert Square; Hyde Farm; Lansdowne Gardens; Leigham Court Estate. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Lambeth planning department to check whether an Article 4 direction applies to your property.

Check with Lambeth planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Conservatory

Generally permitted under Part 1, Class A, following the same rules as single-storey rear extensions. Maximum depth of 3m (semi/terraced) or 4m (detached) under standard PD, extending to 6m or 8m under prior approval.

Conditions

  • 1Same conditions as single-storey rear extensions
  • 2Maximum depth 3m (semi/terraced) or 4m (detached) under standard PD
  • 3Maximum height 4m; eaves 3m if within 2m of boundary
  • 4Must not cover more than half the curtilage
  • 5Must not be forward of the principal elevation

Size and Dimension Limits

  • Maximum height: 4m
  • Eaves height: 3m if within 2m of a boundary
  • Depth: 3m (semi/terraced) or 4m (detached) under standard PD

When Permitted Development Does Not Apply

  • Cumulative total of all extensions and outbuildings must not cover more than half the curtilage
  • Restricted or removed in designated areas
  • Removing the separating wall/door between conservatory and house triggers Building Regulations for thermal performance

What About Building Regulations?

Building regulations approval is not usually required

A conservatory is exempt from Building Regulations provided it is at ground level, under 30 square metres, has its own independent heating with separate controls, is separated from the house by external-quality walls, windows, and doors, and any glazing complies with safety glazing requirements. Removing the separating wall or door means Building Regulations apply in full.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Lambeth building control or use an approved inspector.

How to Apply in Lambeth

If you need planning permission for your conservatory, you can apply through Lambeth's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Lambeth Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Lambeth. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Enforcement risk is the same as for single-storey extensions. Conservatories that breach PD limits can face enforcement notices. Removing the separating wall without Building Regulations approval is a common issue flagged during property sales.

Frequently Asked Questions

Do I need planning permission for a conservatory in Lambeth?
Generally permitted under Part 1, Class A, following the same rules as single-storey rear extensions. Maximum depth of 3m (semi/terraced) or 4m (detached) under standard PD, extending to 6m or 8m under prior approval. Note: Lambeth has 64 conservation areas (including Abbeville Road, Albert Embankment, Albert Square) and 12 recorded Article 4 directions where permitted development rights may be restricted. Check with Lambeth planning department.
Does a conservatory in Lambeth need building regulations?
Building regulations approval is not usually required for a conservatory. A conservatory is exempt from Building Regulations provided it is at ground level, under 30 square metres, has its own independent heating with separate controls, is separated from the house by external-quality walls, windows, and doors, and any glazing complies with safety glazing requirements. Removing the separating wall or door means Building Regulations apply in full.
How do I apply for planning permission in Lambeth?
You can apply for planning permission through Lambeth's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Lambeth?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Lambeth decided 95% of applications within the statutory or agreed time, and 61% of householder applications within 8 weeks.
What percentage of planning applications does Lambeth approve?
Lambeth granted 80% of the 1,725 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 83%.

Find a Conservatory Specialist in Lambeth

Browse local conservatory specialists on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Conservatory rules in nearby council areas

Other projects in Lambeth