Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentDerby (East Midlands)

Do I Need Planning Permission for a Conservatory in Derby?

A glazed extension, typically to the rear of the property, used as a living or dining space. Conservatories follow the same permitted development rules as single-storey extensions but may be exempt from Building Regulations if they meet certain conditions.

Planning in Derby

91%

of planning applications granted

88%

decided within the statutory or agreed time

42%

of householder applications decided within 8 weeks

In the year to December 2025, Derby decided 937 planning applications. 498 of these were householder projects such as extensions, loft conversions and outbuildings, of which 91% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Derby

Derby has 15 conservation areas. These include Allestree, Arboretum, City Centre, Darley Abbey, Friar Gate, Hartington Street. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Derby has Article 4 directions in force. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Derby planning department to check whether an Article 4 direction applies to your property.

Check with Derby planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Conservatory

Generally permitted under Part 1, Class A, following the same rules as single-storey rear extensions. Maximum depth of 3m (semi/terraced) or 4m (detached) under standard PD, extending to 6m or 8m under prior approval.

Conditions

  • 1Same conditions as single-storey rear extensions
  • 2Maximum depth 3m (semi/terraced) or 4m (detached) under standard PD
  • 3Maximum height 4m; eaves 3m if within 2m of boundary
  • 4Must not cover more than half the curtilage
  • 5Must not be forward of the principal elevation

Size and Dimension Limits

  • Maximum height: 4m
  • Eaves height: 3m if within 2m of a boundary
  • Depth: 3m (semi/terraced) or 4m (detached) under standard PD

When Permitted Development Does Not Apply

  • Cumulative total of all extensions and outbuildings must not cover more than half the curtilage
  • Restricted or removed in designated areas
  • Removing the separating wall/door between conservatory and house triggers Building Regulations for thermal performance

What About Building Regulations?

Building regulations approval is not usually required

A conservatory is exempt from Building Regulations provided it is at ground level, under 30 square metres, has its own independent heating with separate controls, is separated from the house by external-quality walls, windows, and doors, and any glazing complies with safety glazing requirements. Removing the separating wall or door means Building Regulations apply in full.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Derby building control or use an approved inspector.

How to Apply in Derby

If you need planning permission for your conservatory, you can apply through Derby's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Derby Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Derby. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Enforcement risk is the same as for single-storey extensions. Conservatories that breach PD limits can face enforcement notices. Removing the separating wall without Building Regulations approval is a common issue flagged during property sales.

Frequently Asked Questions

Do I need planning permission for a conservatory in Derby?
Generally permitted under Part 1, Class A, following the same rules as single-storey rear extensions. Maximum depth of 3m (semi/terraced) or 4m (detached) under standard PD, extending to 6m or 8m under prior approval. Note: Derby has 15 conservation areas (including Allestree, Arboretum, City Centre) where permitted development rights may be restricted. Check with Derby planning department.
Does a conservatory in Derby need building regulations?
Building regulations approval is not usually required for a conservatory. A conservatory is exempt from Building Regulations provided it is at ground level, under 30 square metres, has its own independent heating with separate controls, is separated from the house by external-quality walls, windows, and doors, and any glazing complies with safety glazing requirements. Removing the separating wall or door means Building Regulations apply in full.
How do I apply for planning permission in Derby?
You can apply for planning permission through Derby's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Derby?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Derby decided 88% of applications within the statutory or agreed time, and 42% of householder applications within 8 weeks.
What percentage of planning applications does Derby approve?
Derby granted 91% of the 937 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 91%.

Find a Conservatory Specialist in Derby

Browse local conservatory specialists on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Conservatory rules in nearby council areas

Other projects in Derby