This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentKingston upon Hull (Yorkshire and the Humber)

Do I Need Planning Permission for a Chimney Removal in Kingston upon Hull?

Removing a chimney breast internally, reducing the chimney stack externally, or removing the chimney entirely. Internal removal is generally PD, but external changes to the roofline may need planning permission.

Planning in Kingston upon Hull

92%

of planning applications granted

72%

decided within the statutory or agreed time

57%

of householder applications decided within 8 weeks

In the year to December 2025, Kingston upon Hull decided 412 planning applications. 120 of these were householder projects such as extensions, loft conversions and outbuildings, of which 90% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Kingston upon Hull

Kingston upon Hull has 26 conservation areas. These include Anlaby Park, Avenues/Pearson Park, Beverley High Road, Beverley Road, Boulevard, Broadway. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Kingston upon Hull planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Chimney Removal

Generally permitted. Internal chimney breast removal is an internal alteration that does not need planning permission. Removing the external chimney stack above the roofline may be PD provided it does not significantly change the roof's appearance. In conservation areas or for listed buildings, additional consents apply.

Conditions

  • 1Internal removal of a chimney breast does not require planning permission
  • 2Reducing or removing the external stack may be PD if the roof is made good
  • 3Must ensure structural integrity of the remaining building (party wall, load-bearing considerations)
  • 4In terraced or semi-detached houses, chimney stacks shared with neighbours may have party wall implications

Size and Dimension Limits

  • No specific dimensions; the work is removal rather than addition

When Permitted Development Does Not Apply

  • Listed building consent is required for chimney removal on listed buildings
  • In conservation areas, removal of a chimney that contributes to the character of the area may need PP
  • Party Wall Act 1996 applies if the chimney is shared with an adjoining property
  • Must retain any fire-stopping and structural support needed by the remaining building

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval is required covering structural support for remaining floors and walls (gallows brackets or steel supports), fire stopping where the chimney passes through floors and the roof, and ensuring the remaining structure meets fire safety standards.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Kingston upon Hull building control or use an approved inspector.

How to Apply in Kingston upon Hull

If you need planning permission for your chimney removal, you can apply through Kingston upon Hull's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Kingston upon Hull Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Kingston upon Hull. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low enforcement risk for internal removal with proper structural support. Removing an external chimney in a conservation area without consent may attract enforcement. Structural failure from inadequate support is a building safety issue that can lead to prosecution.

Frequently Asked Questions

Do I need planning permission for a chimney removal in Kingston upon Hull?
Generally permitted. Internal chimney breast removal is an internal alteration that does not need planning permission. Removing the external chimney stack above the roofline may be PD provided it does not significantly change the roof's appearance. In conservation areas or for listed buildings, additional consents apply. Note: Kingston upon Hull has 26 conservation areas (including Anlaby Park, Avenues/Pearson Park, Beverley High Road) where permitted development rights may be restricted. Check with Kingston upon Hull planning department.
Does a chimney removal in Kingston upon Hull need building regulations?
Yes. Building Regulations approval is required covering structural support for remaining floors and walls (gallows brackets or steel supports), fire stopping where the chimney passes through floors and the roof, and ensuring the remaining structure meets fire safety standards. Contact Kingston upon Hull building control or an approved inspector for details.
How do I apply for planning permission in Kingston upon Hull?
You can apply for planning permission through Kingston upon Hull's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Kingston upon Hull?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Kingston upon Hull decided 72% of applications within the statutory or agreed time, and 57% of householder applications within 8 weeks.
What percentage of planning applications does Kingston upon Hull approve?
Kingston upon Hull granted 92% of the 412 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 90%.

Find a Builder in Kingston upon Hull

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Chimney Removal rules in nearby council areas

Other projects in Kingston upon Hull