Do I Need Planning Permission for a Chimney Removal in Birmingham?

Removing a chimney breast internally, reducing the chimney stack externally, or removing the chimney entirely. Internal removal is generally PD, but external changes to the roofline may need planning permission.

Planning in Birmingham

83%

of planning applications granted

61%

decided within the statutory or agreed time

39%

of householder applications decided within 8 weeks

In the year to December 2025, Birmingham decided 3,533 planning applications. 2,232 of these were householder projects such as extensions, loft conversions and outbuildings, of which 86% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Birmingham

Birmingham has 29 conservation areas. These include Anchorage Road, Sutton Coldfield Conservation Area, Aston Hall and Church Conservation Area, Austin Village Conservation Area, Barnsley Road, Edgbaston Conservation Area, Bournville Tenants Conservation Area, Bournville Village Conservation Area. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Birmingham has 12 recorded Article 4 directions. These include City Wide Hmo; Greenfield Road, Harborne Conservation Area; Selly Oak Hmo; Selly Park Avenues Conservation Area. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Birmingham planning department to check whether an Article 4 direction applies to your property.

Check with Birmingham planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Chimney Removal

Generally permitted. Internal chimney breast removal is an internal alteration that does not need planning permission. Removing the external chimney stack above the roofline may be PD provided it does not significantly change the roof's appearance. In conservation areas or for listed buildings, additional consents apply.

Conditions

  • 1Internal removal of a chimney breast does not require planning permission
  • 2Reducing or removing the external stack may be PD if the roof is made good
  • 3Must ensure structural integrity of the remaining building (party wall, load-bearing considerations)
  • 4In terraced or semi-detached houses, chimney stacks shared with neighbours may have party wall implications

Size and Dimension Limits

  • No specific dimensions; the work is removal rather than addition

When Permitted Development Does Not Apply

  • Listed building consent is required for chimney removal on listed buildings
  • In conservation areas, removal of a chimney that contributes to the character of the area may need PP
  • Party Wall Act 1996 applies if the chimney is shared with an adjoining property
  • Must retain any fire-stopping and structural support needed by the remaining building

What About Building Regulations?

Building regulations approval is likely required

Building Regulations approval is required covering structural support for remaining floors and walls (gallows brackets or steel supports), fire stopping where the chimney passes through floors and the roof, and ensuring the remaining structure meets fire safety standards.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Birmingham building control or use an approved inspector.

How to Apply in Birmingham

If you need planning permission for your chimney removal, you can apply through Birmingham's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Birmingham Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Birmingham. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low enforcement risk for internal removal with proper structural support. Removing an external chimney in a conservation area without consent may attract enforcement. Structural failure from inadequate support is a building safety issue that can lead to prosecution.

Frequently Asked Questions

Do I need planning permission for a chimney removal in Birmingham?
Generally permitted. Internal chimney breast removal is an internal alteration that does not need planning permission. Removing the external chimney stack above the roofline may be PD provided it does not significantly change the roof's appearance. In conservation areas or for listed buildings, additional consents apply. Note: Birmingham has 29 conservation areas (including Anchorage Road, Sutton Coldfield Conservation Area, Aston Hall and Church Conservation Area, Austin Village Conservation Area) and 12 recorded Article 4 directions where permitted development rights may be restricted. Check with Birmingham planning department.
Does a chimney removal in Birmingham need building regulations?
Yes. Building Regulations approval is required covering structural support for remaining floors and walls (gallows brackets or steel supports), fire stopping where the chimney passes through floors and the roof, and ensuring the remaining structure meets fire safety standards. Contact Birmingham building control or an approved inspector for details.
How do I apply for planning permission in Birmingham?
You can apply for planning permission through Birmingham's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Birmingham?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Birmingham decided 61% of applications within the statutory or agreed time, and 39% of householder applications within 8 weeks.
What percentage of planning applications does Birmingham approve?
Birmingham granted 83% of the 3,533 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 86%.