Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentNewcastle upon Tyne (North East)

Do I Need Planning Permission for a Carport in Newcastle upon Tyne?

A covered structure for parking vehicles, open on at least two sides. Carports follow the same PD rules as outbuildings, with the additional requirement that they must remain open-sided.

Planning in Newcastle upon Tyne

92%

of planning applications granted

84%

decided within the statutory or agreed time

56%

of householder applications decided within 8 weeks

In the year to December 2025, Newcastle upon Tyne decided 910 planning applications. 368 of these were householder projects such as extensions, loft conversions and outbuildings, of which 96% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Newcastle upon Tyne

Newcastle upon Tyne has 12 conservation areas. These include Brandling Village, Central, Framlington Place, Gosforth, Jesmond Dene, Leazes. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Newcastle upon Tyne has 8 recorded Article 4 directions. These include Brandy Vaults; Dukes Cottages; HW Jesmond & N Jesmond; Jesmond and Heaton. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Newcastle upon Tyne planning department to check whether an Article 4 direction applies to your property.

Check with Newcastle upon Tyne planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Carport

Generally permitted under Part 1, Class E as an outbuilding. A carport must be open on at least two sides to distinguish it from a garage. The same height and area limits apply as for other outbuildings.

Conditions

  • 1Must be open on at least two sides
  • 2Must not be forward of the principal elevation fronting a highway
  • 3Same height limits as outbuildings (2.5m within 2m of boundary; 4m/3m elsewhere)
  • 4Must not cover more than half the curtilage

Size and Dimension Limits

  • Height within 2m of boundary: 2.5m maximum
  • Height elsewhere: 4m (dual pitch) or 3m (other roofs)
  • Total outbuilding area must not exceed 50% of curtilage

When Permitted Development Does Not Apply

  • Enclosing a carport on more sides effectively creates a garage, potentially changing its PD status
  • Designated area restrictions apply
  • Must remain for purposes incidental to the dwelling

What About Building Regulations?

Building regulations approval is not usually required

Carports are normally exempt from Building Regulations as open-sided structures under 30 square metres. If enclosed, the same rules as outbuildings apply based on floor area and proximity to boundaries.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Newcastle upon Tyne building control or use an approved inspector.

How to Apply in Newcastle upon Tyne

If you need planning permission for your carport, you can apply through Newcastle upon Tyne's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Newcastle upon Tyne Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Newcastle upon Tyne. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk if within PD limits. Enclosing a carport to create a garage without checking PD compliance could attract enforcement. Carports forward of the principal elevation are not permitted development.

Frequently Asked Questions

Do I need planning permission for a carport in Newcastle upon Tyne?
Generally permitted under Part 1, Class E as an outbuilding. A carport must be open on at least two sides to distinguish it from a garage. The same height and area limits apply as for other outbuildings. Note: Newcastle upon Tyne has 12 conservation areas (including Brandling Village, Central, Framlington Place) and 8 recorded Article 4 directions where permitted development rights may be restricted. Check with Newcastle upon Tyne planning department.
Does a carport in Newcastle upon Tyne need building regulations?
Building regulations approval is not usually required for a carport. Carports are normally exempt from Building Regulations as open-sided structures under 30 square metres. If enclosed, the same rules as outbuildings apply based on floor area and proximity to boundaries.
How do I apply for planning permission in Newcastle upon Tyne?
You can apply for planning permission through Newcastle upon Tyne's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Newcastle upon Tyne?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Newcastle upon Tyne decided 84% of applications within the statutory or agreed time, and 56% of householder applications within 8 weeks.
What percentage of planning applications does Newcastle upon Tyne approve?
Newcastle upon Tyne granted 92% of the 910 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 96%.

Find a Builder in Newcastle upon Tyne

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Carport rules in nearby council areas

Other projects in Newcastle upon Tyne