Skip to content
How It WorksFor Tradespeople
List for FreeLog In

This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentEast Devon (South West)

Do I Need Planning Permission for a Carport in East Devon?

A covered structure for parking vehicles, open on at least two sides. Carports follow the same PD rules as outbuildings, with the additional requirement that they must remain open-sided.

Planning in East Devon

89%

of planning applications granted

74%

decided within the statutory or agreed time

69%

of householder applications decided within 8 weeks

In the year to December 2025, East Devon decided 1,323 planning applications. 622 of these were householder projects such as extensions, loft conversions and outbuildings, of which 93% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in East Devon

East Devon has 32 conservation areas. These include Axminster, Beer, Brampford Speke, Broadclyst, Broadhembury, Budleigh Salterton. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with East Devon planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Carport

Generally permitted under Part 1, Class E as an outbuilding. A carport must be open on at least two sides to distinguish it from a garage. The same height and area limits apply as for other outbuildings.

Conditions

  • 1Must be open on at least two sides
  • 2Must not be forward of the principal elevation fronting a highway
  • 3Same height limits as outbuildings (2.5m within 2m of boundary; 4m/3m elsewhere)
  • 4Must not cover more than half the curtilage

Size and Dimension Limits

  • Height within 2m of boundary: 2.5m maximum
  • Height elsewhere: 4m (dual pitch) or 3m (other roofs)
  • Total outbuilding area must not exceed 50% of curtilage

When Permitted Development Does Not Apply

  • Enclosing a carport on more sides effectively creates a garage, potentially changing its PD status
  • Designated area restrictions apply
  • Must remain for purposes incidental to the dwelling

What About Building Regulations?

Building regulations approval is not usually required

Carports are normally exempt from Building Regulations as open-sided structures under 30 square metres. If enclosed, the same rules as outbuildings apply based on floor area and proximity to boundaries.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact East Devon building control or use an approved inspector.

How to Apply in East Devon

If you need planning permission for your carport, you can apply through East Devon's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit East Devon Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from East Devon. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk if within PD limits. Enclosing a carport to create a garage without checking PD compliance could attract enforcement. Carports forward of the principal elevation are not permitted development.

Frequently Asked Questions

Do I need planning permission for a carport in East Devon?
Generally permitted under Part 1, Class E as an outbuilding. A carport must be open on at least two sides to distinguish it from a garage. The same height and area limits apply as for other outbuildings. Note: East Devon has 32 conservation areas (including Axminster, Beer, Brampford Speke) where permitted development rights may be restricted. Check with East Devon planning department.
Does a carport in East Devon need building regulations?
Building regulations approval is not usually required for a carport. Carports are normally exempt from Building Regulations as open-sided structures under 30 square metres. If enclosed, the same rules as outbuildings apply based on floor area and proximity to boundaries.
How do I apply for planning permission in East Devon?
You can apply for planning permission through East Devon's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in East Devon?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, East Devon decided 74% of applications within the statutory or agreed time, and 69% of householder applications within 8 weeks.
What percentage of planning applications does East Devon approve?
East Devon granted 89% of the 1,323 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 93%.

Find a Builder in East Devon

Browse local builders on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Carport rules in nearby council areas

Other projects in East Devon