This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentCannock Chase (West Midlands)

Do I Need Planning Permission for a Carport in Cannock Chase?

A covered structure for parking vehicles, open on at least two sides. Carports follow the same PD rules as outbuildings, with the additional requirement that they must remain open-sided.

Planning in Cannock Chase

90%

of planning applications granted

95%

decided within the statutory or agreed time

86%

of householder applications decided within 8 weeks

In the year to December 2025, Cannock Chase decided 247 planning applications. 122 of these were householder projects such as extensions, loft conversions and outbuildings, of which 91% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Cannock Chase

Cannock Chase has 8 conservation areas. These include Cannock Town Centre, Church Street, Rugeley, Main Road, Brereton, North Street, Bridgtown, Rugeley Town Centre, Sheepfair Bow Street. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Check with Cannock Chase planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Carport

Generally permitted under Part 1, Class E as an outbuilding. A carport must be open on at least two sides to distinguish it from a garage. The same height and area limits apply as for other outbuildings.

Conditions

  • 1Must be open on at least two sides
  • 2Must not be forward of the principal elevation fronting a highway
  • 3Same height limits as outbuildings (2.5m within 2m of boundary; 4m/3m elsewhere)
  • 4Must not cover more than half the curtilage

Size and Dimension Limits

  • Height within 2m of boundary: 2.5m maximum
  • Height elsewhere: 4m (dual pitch) or 3m (other roofs)
  • Total outbuilding area must not exceed 50% of curtilage

When Permitted Development Does Not Apply

  • Enclosing a carport on more sides effectively creates a garage, potentially changing its PD status
  • Designated area restrictions apply
  • Must remain for purposes incidental to the dwelling

What About Building Regulations?

Building regulations approval is not usually required

Carports are normally exempt from Building Regulations as open-sided structures under 30 square metres. If enclosed, the same rules as outbuildings apply based on floor area and proximity to boundaries.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Cannock Chase building control or use an approved inspector.

How to Apply in Cannock Chase

If you need planning permission for your carport, you can apply through Cannock Chase's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Cannock Chase Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Cannock Chase. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low risk if within PD limits. Enclosing a carport to create a garage without checking PD compliance could attract enforcement. Carports forward of the principal elevation are not permitted development.

Frequently Asked Questions

Do I need planning permission for a carport in Cannock Chase?
Generally permitted under Part 1, Class E as an outbuilding. A carport must be open on at least two sides to distinguish it from a garage. The same height and area limits apply as for other outbuildings. Note: Cannock Chase has 8 conservation areas (including Cannock Town Centre, Church Street, Rugeley, Main Road, Brereton) where permitted development rights may be restricted. Check with Cannock Chase planning department.
Does a carport in Cannock Chase need building regulations?
Building regulations approval is not usually required for a carport. Carports are normally exempt from Building Regulations as open-sided structures under 30 square metres. If enclosed, the same rules as outbuildings apply based on floor area and proximity to boundaries.
How do I apply for planning permission in Cannock Chase?
You can apply for planning permission through Cannock Chase's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Cannock Chase?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Cannock Chase decided 95% of applications within the statutory or agreed time, and 86% of householder applications within 8 weeks.
What percentage of planning applications does Cannock Chase approve?
Cannock Chase granted 90% of the 247 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 91%.