This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentTandridge (South East)

Do I Need Planning Permission for a Biomass Boiler in Tandridge?

Installing a biomass boiler that burns wood pellets, chips, or logs to provide heating and hot water. The boiler itself is an internal installation, but the flue has specific PD conditions.

Planning in Tandridge

84%

of planning applications granted

91%

decided within the statutory or agreed time

51%

of householder applications decided within 8 weeks

In the four quarters to 2026 Q1, Tandridge decided 701 planning applications. 423 of these were householder projects such as extensions, loft conversions and outbuildings, of which 90% were granted.

Planning statistics: MHCLG planning application statistics, the four quarters to 2026 Q1. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Tandridge

Tandridge has 19 conservation areas. These include Bletchingley, Broadham Green and Spring Lane, Burstow, Caterham Barracks, Chaldon, Fickleshole. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Tandridge has 45 recorded Article 4 directions. These include Fortunon Farm, Godstone Hill, Godstone.; Land Adj. Tenchleys Farm, Tenchleys Lane, Limpsfield.; Land At Burstow Lodge Farm, Normans Corner, Smallfield.; Land At Dairy House Farm, Green Lane, Outwood.. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Tandridge planning department to check whether an Article 4 direction applies to your property.

Check with Tandridge planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Biomass Boiler

Generally permitted under Part 14 of the GPDO. The boiler is installed internally and does not need planning permission. The flue is permitted under the same rules as chimney/flue installation (Part 1, Class G): it must not exceed the highest part of the roof by more than 1m.

Conditions

  • 1The flue must not exceed the highest part of the roof by more than 1m
  • 2Only one flue per dwelling under PD
  • 3Must comply with smoke control area requirements (DEFRA-approved appliance)
  • 4The flue must not be on the principal elevation fronting a highway in designated areas
  • 5Fuel storage (pellet/chip hopper) is an internal or outbuilding consideration

Size and Dimension Limits

  • Flue: must not exceed highest part of roof by more than 1m
  • One flue per dwelling under PD

When Permitted Development Does Not Apply

  • Listed buildings require listed building consent for flue installation
  • Smoke control areas require a DEFRA-approved appliance
  • External fuel storage follows outbuilding PD rules
  • Emissions must comply with clean air legislation

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply covering Part J (combustion appliances and fuel storage), Part L (energy efficiency), ventilation (adequate air supply), carbon monoxide detection, and flue design. A HETAS-registered installer can self-certify compliance.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Tandridge building control or use an approved inspector.

How to Apply in Tandridge

If you need planning permission for your biomass boiler, you can apply through Tandridge's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Tandridge Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Tandridge. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low planning enforcement risk. The main regulatory risks are clean air legislation (smoke control areas) and Building Regulations compliance. Using a non-approved appliance in a smoke control area is a criminal offence.

Frequently Asked Questions

Do I need planning permission for a biomass boiler in Tandridge?
Generally permitted under Part 14 of the GPDO. The boiler is installed internally and does not need planning permission. The flue is permitted under the same rules as chimney/flue installation (Part 1, Class G): it must not exceed the highest part of the roof by more than 1m. Note: Tandridge has 19 conservation areas (including Bletchingley, Broadham Green and Spring Lane, Burstow) and 45 recorded Article 4 directions where permitted development rights may be restricted. Check with Tandridge planning department.
Does a biomass boiler in Tandridge need building regulations?
Yes. Building Regulations apply covering Part J (combustion appliances and fuel storage), Part L (energy efficiency), ventilation (adequate air supply), carbon monoxide detection, and flue design. A HETAS-registered installer can self-certify compliance. Contact Tandridge building control or an approved inspector for details.
How do I apply for planning permission in Tandridge?
You can apply for planning permission through Tandridge's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Tandridge?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the four quarters to 2026 Q1, Tandridge decided 91% of applications within the statutory or agreed time, and 51% of householder applications within 8 weeks.
What percentage of planning applications does Tandridge approve?
Tandridge granted 84% of the 701 planning applications it decided in the four quarters to 2026 Q1. For householder applications such as extensions and outbuildings, the approval rate was 90%.

Find a Heating Engineer in Tandridge

Browse local heating engineers on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.

Biomass Boiler rules in nearby council areas

Other projects in Tandridge

Help us improve Tradesfolk

Found a bug or have an idea? Tell us what would make Tradesfolk more useful for you.

For bugs, tell us what you were trying to do and what went wrong.

Add this if you would like us to reply.

Page included with your feedback:

Sent to hello@tradesfolk.co