Do I Need Planning Permission for a Biomass Boiler in Havant?

Installing a biomass boiler that burns wood pellets, chips, or logs to provide heating and hot water. The boiler itself is an internal installation, but the flue has specific PD conditions.

Planning in Havant

94%

of planning applications granted

80%

decided within the statutory or agreed time

37%

of householder applications decided within 8 weeks

In the year to December 2025, Havant decided 419 planning applications. 294 of these were householder projects such as extensions, loft conversions and outbuildings, of which 96% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Havant

Havant has 14 conservation areas. These include Brockhampton, Coastguards, Emsworth, Langstone, Lymbourn Road, Mill Lane. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Havant has 6 recorded Article 4 directions. These include Langstone. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Havant planning department to check whether an Article 4 direction applies to your property.

Check with Havant planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Biomass Boiler

Generally permitted under Part 14 of the GPDO. The boiler is installed internally and does not need planning permission. The flue is permitted under the same rules as chimney/flue installation (Part 1, Class G): it must not exceed the highest part of the roof by more than 1m.

Conditions

  • 1The flue must not exceed the highest part of the roof by more than 1m
  • 2Only one flue per dwelling under PD
  • 3Must comply with smoke control area requirements (DEFRA-approved appliance)
  • 4The flue must not be on the principal elevation fronting a highway in designated areas
  • 5Fuel storage (pellet/chip hopper) is an internal or outbuilding consideration

Size and Dimension Limits

  • Flue: must not exceed highest part of roof by more than 1m
  • One flue per dwelling under PD

When Permitted Development Does Not Apply

  • Listed buildings require listed building consent for flue installation
  • Smoke control areas require a DEFRA-approved appliance
  • External fuel storage follows outbuilding PD rules
  • Emissions must comply with clean air legislation

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply covering Part J (combustion appliances and fuel storage), Part L (energy efficiency), ventilation (adequate air supply), carbon monoxide detection, and flue design. A HETAS-registered installer can self-certify compliance.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Havant building control or use an approved inspector.

How to Apply in Havant

If you need planning permission for your biomass boiler, you can apply through Havant's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Havant Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Havant. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low planning enforcement risk. The main regulatory risks are clean air legislation (smoke control areas) and Building Regulations compliance. Using a non-approved appliance in a smoke control area is a criminal offence.

Frequently Asked Questions

Do I need planning permission for a biomass boiler in Havant?
Generally permitted under Part 14 of the GPDO. The boiler is installed internally and does not need planning permission. The flue is permitted under the same rules as chimney/flue installation (Part 1, Class G): it must not exceed the highest part of the roof by more than 1m. Note: Havant has 14 conservation areas (including Brockhampton, Coastguards, Emsworth) and 6 recorded Article 4 directions where permitted development rights may be restricted. Check with Havant planning department.
Does a biomass boiler in Havant need building regulations?
Yes. Building Regulations apply covering Part J (combustion appliances and fuel storage), Part L (energy efficiency), ventilation (adequate air supply), carbon monoxide detection, and flue design. A HETAS-registered installer can self-certify compliance. Contact Havant building control or an approved inspector for details.
How do I apply for planning permission in Havant?
You can apply for planning permission through Havant's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Havant?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Havant decided 80% of applications within the statutory or agreed time, and 37% of householder applications within 8 weeks.
What percentage of planning applications does Havant approve?
Havant granted 94% of the 419 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 96%.