This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentAdur (South East)

Do I Need Planning Permission for a Biomass Boiler in Adur?

Installing a biomass boiler that burns wood pellets, chips, or logs to provide heating and hot water. The boiler itself is an internal installation, but the flue has specific PD conditions.

Planning in Adur

92%

of planning applications granted

93%

decided within the statutory or agreed time

59%

of householder applications decided within 8 weeks

In the year to December 2025, Adur decided 310 planning applications. 213 of these were householder projects such as extensions, loft conversions and outbuildings, of which 95% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Adur

Adur has 7 conservation areas. These include Kingston Buci, North Lancing, Old Shoreham, Shoreham-by-Sea, Sompting, Southlands. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Adur has 9 recorded Article 4 directions. These include Church Street, Shoreham-by-Sea; Kingston Buci Conservation Area; Land adjoining Steyning Road, Shoreham-by-Sea; Land at Southwick Old Rectory, Kingston Lane, Southwick. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Adur planning department to check whether an Article 4 direction applies to your property.

Check with Adur planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Biomass Boiler

Generally permitted under Part 14 of the GPDO. The boiler is installed internally and does not need planning permission. The flue is permitted under the same rules as chimney/flue installation (Part 1, Class G): it must not exceed the highest part of the roof by more than 1m.

Conditions

  • 1The flue must not exceed the highest part of the roof by more than 1m
  • 2Only one flue per dwelling under PD
  • 3Must comply with smoke control area requirements (DEFRA-approved appliance)
  • 4The flue must not be on the principal elevation fronting a highway in designated areas
  • 5Fuel storage (pellet/chip hopper) is an internal or outbuilding consideration

Size and Dimension Limits

  • Flue: must not exceed highest part of roof by more than 1m
  • One flue per dwelling under PD

When Permitted Development Does Not Apply

  • Listed buildings require listed building consent for flue installation
  • Smoke control areas require a DEFRA-approved appliance
  • External fuel storage follows outbuilding PD rules
  • Emissions must comply with clean air legislation

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply covering Part J (combustion appliances and fuel storage), Part L (energy efficiency), ventilation (adequate air supply), carbon monoxide detection, and flue design. A HETAS-registered installer can self-certify compliance.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Adur building control or use an approved inspector.

How to Apply in Adur

If you need planning permission for your biomass boiler, you can apply through Adur's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed.
Cost:£258
Visit Adur Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Adur. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Low planning enforcement risk. The main regulatory risks are clean air legislation (smoke control areas) and Building Regulations compliance. Using a non-approved appliance in a smoke control area is a criminal offence.

Frequently Asked Questions

Do I need planning permission for a biomass boiler in Adur?
Generally permitted under Part 14 of the GPDO. The boiler is installed internally and does not need planning permission. The flue is permitted under the same rules as chimney/flue installation (Part 1, Class G): it must not exceed the highest part of the roof by more than 1m. Note: Adur has 7 conservation areas (including Kingston Buci, North Lancing, Old Shoreham) and 9 recorded Article 4 directions where permitted development rights may be restricted. Check with Adur planning department.
Does a biomass boiler in Adur need building regulations?
Yes. Building Regulations apply covering Part J (combustion appliances and fuel storage), Part L (energy efficiency), ventilation (adequate air supply), carbon monoxide detection, and flue design. A HETAS-registered installer can self-certify compliance. Contact Adur building control or an approved inspector for details.
How do I apply for planning permission in Adur?
You can apply for planning permission through Adur's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed..
How long does planning permission take in Adur?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Adur decided 93% of applications within the statutory or agreed time, and 59% of householder applications within 8 weeks.
What percentage of planning applications does Adur approve?
Adur granted 92% of the 310 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 95%.