This is general guidance based on standard permitted development rights in England. Rules differ for listed buildings, conservation areas, and properties with Article 4 directions. Always confirm with your local planning authority before starting work.

Usually Permitted DevelopmentHackney (London)

Do I Need Planning Permission for a Battery Storage System in Hackney?

Installing a home battery storage system (such as Tesla Powerwall) to store electricity from solar panels or the grid. Internal installations are straightforward; external units follow outbuilding rules.

Planning in Hackney

81%

of planning applications granted

86%

decided within the statutory or agreed time

50%

of householder applications decided within 8 weeks

In the year to December 2025, Hackney decided 1,345 planning applications. 447 of these were householder projects such as extensions, loft conversions and outbuildings, of which 85% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Hackney

Hackney has 30 conservation areas. These include Albion Square, Broadway Market, Clapton Common, Clapton Pond, Clapton Square, Clissold Park. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Hackney has Article 4 directions in force. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Hackney planning department to check whether an Article 4 direction applies to your property.

Check with Hackney planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for a Battery Storage System

Generally permitted. Internal battery installation is an internal alteration that does not need planning permission. External battery units are treated as outbuildings or ancillary structures and follow Part 1, Class E rules (height limits, not forward of the principal elevation, not covering more than half the curtilage).

Conditions

  • 1Internal installation: no planning permission needed
  • 2External unit: follows outbuilding PD rules
  • 3Must not be forward of the principal elevation
  • 4External units within 2m of a boundary: maximum 2.5m height
  • 5Must not cover more than half the curtilage (combined total)

Size and Dimension Limits

  • Internal: no planning limits
  • External: same height limits as outbuildings (2.5m within 2m of boundary; 4m/3m elsewhere)

When Permitted Development Does Not Apply

  • Listed buildings: internal alterations may still need consent if they affect the building's character
  • Fire safety considerations for lithium-ion battery storage
  • Electrical installation must be carried out by a qualified electrician
  • Some insurers have specific requirements for battery installations

What About Building Regulations?

Building regulations approval is not usually required

Building Regulations do not specifically cover battery storage units, but the electrical installation must comply with Part P. Work should be carried out by a registered electrician. The installation should comply with the manufacturer's specifications and any relevant fire safety guidance.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Hackney building control or use an approved inspector.

How to Apply in Hackney

If you need planning permission for your battery storage system, you can apply through Hackney's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications if PP is needed for external units.
Cost:£258
Visit Hackney Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Hackney. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Very low risk. Home battery units are small and unobtrusive. Enforcement is extremely unlikely unless an external unit breaches outbuilding PD rules. The main risk is fire safety, which is a Building Regulations and insurance matter.

Frequently Asked Questions

Do I need planning permission for a battery storage system in Hackney?
Generally permitted. Internal battery installation is an internal alteration that does not need planning permission. External battery units are treated as outbuildings or ancillary structures and follow Part 1, Class E rules (height limits, not forward of the principal elevation, not covering more than half the curtilage). Note: Hackney has 30 conservation areas (including Albion Square, Broadway Market, Clapton Common) where permitted development rights may be restricted. Check with Hackney planning department.
Does a battery storage system in Hackney need building regulations?
Building regulations approval is not usually required for a battery storage system. Building Regulations do not specifically cover battery storage units, but the electrical installation must comply with Part P. Work should be carried out by a registered electrician. The installation should comply with the manufacturer's specifications and any relevant fire safety guidance.
How do I apply for planning permission in Hackney?
You can apply for planning permission through Hackney's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications if PP is needed for external units..
How long does planning permission take in Hackney?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Hackney decided 86% of applications within the statutory or agreed time, and 50% of householder applications within 8 weeks.
What percentage of planning applications does Hackney approve?
Hackney granted 81% of the 1,345 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 85%.

Find an Electrician in Hackney

Browse local electricians on Tradesfolk. Read reviews, compare quotes, and hire with confidence. 100% free for homeowners, always.