Do I Need Planning Permission for an Annexe or Granny Flat in Westminster?

A self-contained living space for a family member, either as an extension to the main house or as a separate building in the garden. The key planning issue is whether the annexe is ancillary to the main dwelling or constitutes a separate dwelling.

Planning in Westminster

86%

of planning applications granted

81%

decided within the statutory or agreed time

53%

of householder applications decided within 8 weeks

In the year to December 2025, Westminster decided 4,828 planning applications. 435 of these were householder projects such as extensions, loft conversions and outbuildings, of which 79% were granted.

Planning statistics: MHCLG planning application statistics, the year to December 2025. Conservation area and Article 4 data: planning.data.gov.uk, © Historic England / Crown copyright. Open Government Licence v3.0.

Important: Additional Restrictions May Apply in Westminster

Westminster has 56 conservation areas. These include Adelphi, Albert Gate, Aldridge Road Villas And Leamington Road Villas, Bayswater, Belgravia, Birdcage Walk. If your property is in a conservation area, some or all permitted development rights may be restricted. For example, you may need planning permission for changes that would normally be permitted, including alterations to the roof, cladding, or extensions visible from a public highway.

Westminster has 10 recorded Article 4 directions. These include Queens Park Estate. Article 4 directions remove specific permitted development rights in defined areas. If your property is covered by an Article 4 direction, you may need planning permission for work that would normally be permitted. Contact Westminster planning department to check whether an Article 4 direction applies to your property.

Check with Westminster planning department before starting work to confirm whether your property is affected by any special designations.

Permitted Development Rules for an Annexe or Granny Flat

Whether an annexe is permitted development depends on how it is built and used. If attached to the main house, standard extension PD rules apply. If a separate building in the garden, it may be PD under Part 1, Class E (outbuildings), provided it is used for purposes incidental to the enjoyment of the main dwelling and is not a self-contained separate home.

Conditions

  • 1Must be used for purposes ancillary (incidental) to the main dwelling
  • 2Must not be used as, or let as, a separate independent dwelling
  • 3If an outbuilding: same size and height limits as other outbuildings
  • 4If an extension: same PD rules as rear or side extensions
  • 5The annexe should not have a separate postal address, council tax bill, or utility accounts

Size and Dimension Limits

  • If outbuilding: max height 2.5m within 2m of boundary, otherwise 4m (dual pitch) or 3m (other)
  • If extension: same limits as the relevant extension type
  • Must not cover more than half the curtilage

When Permitted Development Does Not Apply

  • Creating a separate dwelling requires planning permission and potentially a change of use
  • Council tax implications if the annexe is assessed as a separate dwelling
  • Sleeping accommodation in outbuildings is a grey area; discuss with your LPA
  • Not permitted development if forward of the principal elevation

What About Building Regulations?

Building regulations approval is likely required

Building Regulations apply to any habitable accommodation. Covers structural stability, fire safety and escape routes, thermal insulation, ventilation, drainage (if including kitchen or bathroom facilities), electrical installations, and accessibility standards.

Building regulations are separate from planning permission. Even if your project is permitted development, you may still need building regulations approval. Contact Westminster building control or use an approved inspector.

How to Apply in Westminster

If you need planning permission for your annexe or granny flat, you can apply through Westminster's planning department or via the national Planning Portal.

Timeline:8 weeks for householder planning applications.
Cost:£258
Visit Westminster Planning

If your project is permitted development and you want written confirmation, you can apply for a Lawful Development Certificate (LDC) from Westminster. This provides proof that your project does not need planning permission, which can be helpful when selling your property.

What Happens If I Build Without Permission?

Enforcement risk is high if the annexe is used as a separate dwelling without permission. The council can serve an enforcement notice requiring cessation of independent use. This applies regardless of whether the building itself was PD. Using an annexe as a separate rental property without PP is a breach of planning control.

Frequently Asked Questions

Do I need planning permission for an annexe or granny flat in Westminster?
Whether an annexe is permitted development depends on how it is built and used. If attached to the main house, standard extension PD rules apply. If a separate building in the garden, it may be PD under Part 1, Class E (outbuildings), provided it is used for purposes incidental to the enjoyment of the main dwelling and is not a self-contained separate home. Note: Westminster has 56 conservation areas (including Adelphi, Albert Gate, Aldridge Road Villas And Leamington Road Villas) and 10 recorded Article 4 directions where permitted development rights may be restricted. Check with Westminster planning department.
Does an annexe or granny flat in Westminster need building regulations?
Yes. Building Regulations apply to any habitable accommodation. Covers structural stability, fire safety and escape routes, thermal insulation, ventilation, drainage (if including kitchen or bathroom facilities), electrical installations, and accessibility standards. Contact Westminster building control or an approved inspector for details.
How do I apply for planning permission in Westminster?
You can apply for planning permission through Westminster's planning department or via the national Planning Portal. £258. 8 weeks for householder planning applications..
How long does planning permission take in Westminster?
Most planning applications should be decided within 8 weeks (13 weeks for major projects). In the year to December 2025, Westminster decided 81% of applications within the statutory or agreed time, and 53% of householder applications within 8 weeks.
What percentage of planning applications does Westminster approve?
Westminster granted 86% of the 4,828 planning applications it decided in the year to December 2025. For householder applications such as extensions and outbuildings, the approval rate was 79%.